路基表面沉降测量方法的-研究.pdfVIP

  • 13
  • 0
  • 约2.42万字
  • 约 34页
  • 2018-11-24 发布于江苏
  • 举报
■ ABSTRACT ≮ ABSTRACT:The of the deformation emergencehigh-speedrailway,Onsubgrade controlwi廿l thesettlementofthe and higherdemand,makes controlmore the settlementofthemeasurementisthebasisand important.Ofthree,the foundationforthelattertwo.This andreal-time forthe requireslong-term monitoring settlementofthe maintaintheroadbedthatdonotmeetthe subgrade,to requirements andensurethesafe on on isbased timely transportation.Thispaper the竹Study Omni-rectionalandReal-time the Settlement monitoringtechnologyof Subgrade of Dedicated an Line”,and Passenger developed and anddeformationof automaticdetectionreal-time high—precision monitoringsystem onawirelessnetwork.ThisthesisisbasedOn andtheoretical experimental analysis,to measurethe ofthesettlementoftheembankment the manypoint surface,withoptical methodandtoachieve surfacesubsidencemeasurement inthe subgrade system,tested advancedall schemesthe rail,and Beijhag-Shanghaihigh—speed improved by datacollecti

文档评论(0)

1亿VIP精品文档

相关文档