- 13
- 0
- 约2.42万字
- 约 34页
- 2018-11-24 发布于江苏
- 举报
■
ABSTRACT
≮
ABSTRACT:The
of the deformation
emergencehigh-speedrailway,Onsubgrade
controlwi廿l thesettlementofthe and
higherdemand,makes
controlmore the settlementofthemeasurementisthebasisand
important.Ofthree,the
foundationforthelattertwo.This andreal-time forthe
requireslong-term monitoring
settlementofthe maintaintheroadbedthatdonotmeetthe
subgrade,to requirements
andensurethesafe on on
isbased
timely transportation.Thispaper the竹Study
Omni-rectionalandReal-time the Settlement
monitoringtechnologyof Subgrade of
Dedicated an
Line”,and
Passenger developed
and
anddeformationof automaticdetectionreal-time
high—precision monitoringsystem
onawirelessnetwork.ThisthesisisbasedOn andtheoretical
experimental analysis,to
measurethe ofthesettlementoftheembankment the
manypoint surface,withoptical
methodandtoachieve surfacesubsidencemeasurement inthe
subgrade system,tested
advancedall schemesthe
rail,and
Beijhag-Shanghaihigh—speed improved by
datacollecti
您可能关注的文档
最近下载
- 江苏省南通市2024-2025学年七年级上学期期末考试历史试卷(含答案).pdf VIP
- 2025年度民主生活会“五个带头”个人检查发言8篇.docx VIP
- 中望3D建模-电子教案.docx VIP
- 青岛版(六三制)六年级上册科学全册知识点(2022年新改版).doc VIP
- 《企业内部控制》教学课件最终版 1章 基本规范 1.3第一章内部控制的原则.ppt VIP
- 议论文阅读练习.doc VIP
- LPQ65131 直流转换器 QFN4×4-24 恒锐丰科技.pdf VIP
- 人教版五年级语文(下册)写字表课文同步正楷练字帖.pdf VIP
- 营销活动预算编制.pptx VIP
- SH/T 3427-2017 -石油化工管式炉高强低导浇注料工程技术条件.pdf VIP
原创力文档

文档评论(0)