- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
超高建筑结构施工模拟分析及施工方案的长期效应研究土木工程专业论文
哈尔
哈尔滨工业大学工学硕士学位论文
II
II
Abstract
In recent years, the world has emerged a large number of high-rise buildings. With the height of buildings increasing, the structural design and construction are faced with new challenges. It can be found that, the stiffness, bearing load, boundary of structure, the shrinkage and creep deformation of concrete are constantly changing during the construction process. These factors will cause the internal force of structure change, and partial stress may even become the control factors of structure design. In addition, the influence of different construction strategies to the structure isn’t the same. It should pay attention to the long-term effect of the initial deformation and stress, which is caused by the construction. This topic takes shenzhen Kingkey 100 plaza as engineering background. It mainly includes the entire construction simulation analysis and optimization, long-term effect of construction schemes and analysis of pouring height of concrete filled steel tubular, specific as follows:
Do research on the construction simulation analysis of high-rise buildings. Establish construction simulation analysis model, which considers the shrinkage and creep effect of concrete, and the construction leveling measures. It carries on the construction simulation analysis, to explore the variation characteristics of interal force and deformation of the structure duiring the construction process. Then it gives the development law of interal force and deformation along with the construction process, and the distribution characterist ics of vertical deformation along with the height of the structure. The calculated datas are compared with measured datas, and the results are consistent with each other. That is to say, the construction simulation method is effective.
With the construction conditions, do optimization on the construction advance layer of core tube and outside frame, and the bonding time of outrigger truss. The paper has make clea
您可能关注的文档
- 超声振动微铣削系统的建立及铣削力和残余应力的研究-机械制造及其自动化专业论文.docx
- 超声振动辅助成形本构模型理论及实验研究-材料工程专业论文.docx
- 超声振动辅助锯切氧化铝陶瓷机理的研究-机械制造及其自动化专业论文.docx
- 超声振动铣削BK7光学玻璃表面形貌研究-机械工程专业论文.docx
- 超声振动铣削光学玻璃材料加工技术研究-机械工程专业论文.docx
- 超声振动高速铣削刀具系统稳定性的研究-机械工程专业论文.docx
- 超声振动拉丝相关理论及其实验研究-机械电子工程专业论文.docx
- 超声纵波在缺陷固体中散射的数值模拟及可视化装置研究-机械电子工程专业论文.docx
- 超声振动辅助TA2纯钛箔板塑性变形行为与微冲裁机理研究-材料加工工程专业论文.docx
- 超声组织多普勒应变率成像及Tei指数对糖尿病及糖尿病前期患者左室功能研究-影像医学与核医学专业论文.docx
原创力文档


文档评论(0)