- 1、本文档共75页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
带疲劳裂纹钢管混凝土节点的静力性能研究-结构工程专业论文
烟
烟 台 大 学 硕 士 学 位 论 文
II
II
ABSTRACT
Circular hollow section (CHS) tubular joint is consisted of several steel tubes. Different tubes are connected together through welding. Due to the advantages of beautiful configuration, simple connection and higher strength-weight ratio, this type of structures is widely used in many fields, such as offshore structure, high-rise tower, and so on.Moreover, if the chord is filled with concrete, then the concrete-filled circular tubular joint (CFCTJ) is formed, which can enhance the static strength of tubular joints, because the filled concrete can have a restrained effect on the tube to avoid local deformation. In addition, concrete can be restricted by the tube, which can avoid the failure of concrete under compression or tension within a very short period. Hence, such structures are extensively applied in bridge structure and high-rise tower. In the long-term application, however, the tiny crack will occur at the intersection between the brace and the chord under the repeated fluctuant loads caused by wind, sea wave, earthquake and the vehicles in a roundtrip. The crack will continue to propagate with the successive loads, and the net sectional area of the intersection between brace and chord can also decrease, which will cause higher stress concentration, and the structure will fail ultimately due to the quicker crack propagation.
In a tubular joint, the stiffness of the intersection between brace and chord will decrease because of the crack, and the static strength of the tubular joint with crack will also reduce. Therefore, it is necessary to study the static behavior of concrete filled circular tubular T joint with crack. In this study, experimental research and finite element analysis are used to carry out the following work:
Before carrying out the fatigue test, the distribution of hot spot stress along the weld toe of two circular tubular joints is tested, and the curves of the stress concentration factor are obtained. Th
您可能关注的文档
- 大跨度预应力混凝土连续刚构桥的结构仿真分析-建筑与土木工程专业论文.docx
- 大跨度预应力砼梁设计分析及应用-建筑与土木工程专业论文.docx
- 大跨度钢网架累积提升技术研究及施工仿真分析-建筑与土木工程专业论文.docx
- 大跨度预应力输煤栈桥结构优化设计研究-结构工程专业论文.docx
- 大跨度高墩连续刚构桥的稳定性研究和施工监控-岩土工程专业论文.docx
- 大跨度黄土公路隧道变形规律分析-桥梁与隧道工程专业论文.docx
- 大跨度黄土公路隧道变形规律研究-桥梁与隧道工程专业论文.docx
- 大跨度黄土隧道施工方法研究-建筑与土木工程专业论文.docx
- 大跨径PC连续刚构桥的合理构造与腹板裂缝机理研究-桥梁与隧道工程专业论文.docx
- 大跨建筑中张拉结构的艺术化应用研究-建筑设计及其理论专业论文.docx
- 某某单位2024年党建工作总结及2025年工作计划.doc
- 某某市发改委关于2024年度落实党风廉政建设工作责任制情况的报告.doc
- 某某局2024年全面从严治党和党风廉政建设工作总结.doc
- 某某区财政局2024年法治政府建设总结及2025年工作谋划.doc
- 2024年党管武装工作述职报告2篇.doc
- 2024年度国企党委书记抓基层党建工作述职报告3篇.doc
- 公司党委书记2024年述职述廉报告.docx
- 2024年度乡镇党委领导班子民主生活会(四个带头)对照检查材料.doc
- 市医疗保障局关于2024年法治政府建设工作情况的报告.docx
- 市民政局党组2024年巡察整改工作情况报告.docx
文档评论(0)