- 1、本文档共63页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁隧道矿山法施工引起的地表沉降预测-工程管理专业论文
华中科技大学硕士学位论文
华
中
科
技
大
学
硕
士
学
位
论
文
II
II
Abstract
With the continuous economic and social development and the gradual promotion of Urbanization process, Chinas major cities have undertaken the construction of urban rail transit. Urban rail transit represented by metro has played a very important role in promoting our national urbanization process and accelerating our country’s economic and social development. However, as the high-risk of metro construction, historical data show that in the process of metro construction, various security incidents often happen. In the process of metro construction, ground surface settlement due to the metro construction is a key factor which influences the metro construction safety. It is not only related to the subway tunnel own security, but also a potential security threat to the surface structures and buildings along the subway line. So Paying a close attention to the surface settlement changes in the subway construction process, analyzing and predicting the ground surface settlement scientifically and reasonably will provide certain reference for the security of the subway construction and also provide necessary safety guarantee for structures and buildings along the subway line.
In this paper, on the basis of consulting related documental materials and analyzing the actual engineering data, firstly summarizes the surface settlement mechanism caused by parallel twin tunnels construction and introduces the rules of ground surface
settlement caused by parallel twin tunnels. Then, taking 25th section,1 stage project of
Wuhan metro line 2 as an example, influence factors of surface subsidence caused by the parallel double tunnel construction were discussed and factor analysis are made. Finally,
the article still takes 25th section,1 stage project of Wuhan metro line 2 as an example,
by screening the monitoring cross-section and analyzing the cross-section data, based on the Peck formula and making a small correction on
您可能关注的文档
- 地方高校大学生满意度指数模型构建及其测评研究-企业管理专业论文.docx
- 地方高校实践教学有效性研究高等教育学专业论文.docx
- 地方高校学科协调发展研究-高等教育学专业论文.docx
- 地方高校对区域经济发展的影响研究——以衡阳市为例产业经济学专业论文.docx
- 地方高校师资队伍人本管理模式创新分析-公共管理专业论文.docx
- 地方高校师范生师德教育分析-思想政治教育专业论文.docx
- 地方高校开展国际理解教育研究-高等教育学专业论文.docx
- 地方高校德育模式创新分析-高等教育学专业论文.docx
- 地方高校教师教育技术培训现状及策略研究-教育技术学专业论文.docx
- 地方高校教师绩效管理分析-高等教育学专业论文.docx
最近下载
- 水电水利工程基本词汇对照表(法语).docx
- 车间班长个人年终总结范本5篇.docx
- 基于MATLAB的HDB3码编译器的优化设计与实现.pdf VIP
- 一汽奥迪AudiQ7汽车使用手册用户说明书pdf电子版下载.pdf
- 一汽奥迪Q7_车型手册电子版下载_非汽车用户车主车辆使用操作驾驶说明书.pdf VIP
- DL-T-5564-2019输变电工程接入系统设计规程.docx VIP
- 小学奥数题库《几何》-直线型-燕尾模型-2星题(含解析)全国通用版.docx
- 老年综合评估及干预技术应用规范.docx VIP
- 城市老旧小区适老化改造的路径探讨(工程毕业论文资料).doc
- 2023年中国城市居民养老政策体系与市场规模评估报告.pdf VIP
文档评论(0)