网站大量收购闲置独家精品文档,联系QQ:2885784924

供水管网多目标更新优化模型研究-环境工程专业论文.docx

供水管网多目标更新优化模型研究-环境工程专业论文.docx

  1. 1、本文档共69页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
供水管网多目标更新优化模型研究-环境工程专业论文

ABSTRACT Water distribution systems (WDS) as vital urban facilities play an important role in the modern life and urban developments. In many cities in China, the operation of mains suffers from such problems as leakage, pipe failure, pressure fluctuation, contamination and so on, which results in reduced level of service. Research the subject of rehabilitation strategies for mains do really make sense. A decision support system for rehabilitation policy-making is formulated in this thesis, with operations research, system engineering, reliability theory, optimization theory, mathematics and computer technology involved flexibly. Optimal sort of pipes to be restored in mains is illustrated. In this section,pipes are divided into two sets. Primary set is retrieved from the candidate set by topology reliability, and the rest part is so called secondary set. Then total influenced flow and weighted sum of pressure and quality reliability are separately defined as failure strike level for the two sets here and programed with EPANET engine. The probability of pipe failure and the probability of accident are formulated. The two sets are sorted based on Bayesian decision method. The event score is failure strike level and the probability is formulated by reliability theory. Finally, optimal rehabilitation sort are formulated based on some provisions such as threshold break rate and corrosion level and models above. Positive result was derived here. Optimal rehabilitation scheduling for the whole network is illustrated, aiming to get optimal pipe set and size choice. As a muti-objective optimal problem, trade-offs among total cost, failure strike level of the mains, pressure reliability and quality reliability are considerd as four independent goals here. GPU parallel computing based numeration method is structured here first to solve the muti-objective problem. NSGA-II and GPU parallel computing are both used to solve the example problem for comparison. It was shown that G

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档