高墩多跨小曲线半径连续刚构桥施工关键技术研究-建筑与土木工程专业论文.docxVIP

高墩多跨小曲线半径连续刚构桥施工关键技术研究-建筑与土木工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高墩多跨小曲线半径连续刚构桥施工关键技术研究-建筑与土木工程专业论文

西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 The key technical study in the construction of High Pier Small Curve Radius Multi-Span Continuous Rigid-Frame Bridge Specialty: Building and civil engineering Name: Liu changjun Instructor: Prof .Wang sheliang Prof .Zou chao Abstract With the high speed development of chinese economy,chinese transport in recent years has gradually turned to the remote mountainous areas of relatively backward economy.In these areas, gully aspect, topography and landform is complex,all of these bring great difficulty to the bridge construction.According to the characteristics of Hei Ya Gou No.2 bridge in Bao Fu Project,and from the key technology of the construction of High PierSmall Curve Radius Multi-Span Continuous Rigid-Frame Bridge,the research detailed description of the construction process in focus、difficulties and corresponding countermeasures,and also detailed the existing mature application technology innovation.Provided the basis for geting the reasonable construction method to achieve the engineering actuarial .The main contents are: The research gived the scientific and reasonable method and technical for bridge construction,let us skilled to master the method of designing and processing and using the large steel formwork in the high pier construction.It also studyed the method of tower crane with the core of the turning plate for high pier construction .It has the very strong guidance and reference significance to the construction of high piers. t has gived the innovative method which Prefabricate and Cast-in-place for the partition construction by analysing and comparing the methods using steel pipe frame and steel bracket to construct the partition of the high pier. n the research,it studyed on the effect of high pier construction verticality control method and wind loads of thin-walled hollow flexible high piers,and studyed the safety control indexes of the high pier construction under the action of wind load,it summed up a set of system

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档