钻井工程英文课件10.1 Borehole integrity.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* 10.1-* Numerical Procedure Subroutines Debugging Default FEA Meshes: - clean wellbore; - bridged wellbore; - wellbore bottom. * 10.1-* Rock Properties Center for Tectonophysics, TAMU In Progress * 10.1-* Conclusions Model and numerical procedure calculate the flow properties for a produced solid-fluid mixture and estimate the stress distribution within the borehole under blowout conditions. Preliminary results of computer simulations provide insight into the predominant factors that control bridging in deep water environment. The model explains wellbore bridging at early time, possible restarting of fluid flow and increased probability of underground crossflow in bridged well * 10.1-* Conclusions Current activity: - numerical procedures and code debugging; - default meshes development for most probable scenarios; Real data are still critical for model validation * 10.1-* Conclusions The investigation is the part of project Development of a Blowout Intervention Method and Dynamic Kill Simulator for Blowouts Occurring in Ultra-Deepwater conducted under Dr. J.J. Schubert and Dr. P.P. Valko supervision. * * Brief outline where this presentation comes from. * Skalle : Bridging is the most common method of blowout control in OCS (39.6%). Flak : Natural well bridging would shut off most blowouts. Adams and Kuhlman : Formation bridging is responsible for stopping many shallow blowouts. * The plot on the left is one of the outputs from the model. The Blue line is the inflow performance curve at low drawdown. If the formation is instable and flows into the wellbore, it may or may not bridge. If the outflow performance with the produced volume of formation shown in red is completely above the reservoir performance curve a bridge will form. This is because more solids are being produced into the wellbore than the formation fluids can remove from the wellbore. The solids will accumulate and eventually bridge, stopping flow. * Here are sub-routines for the mode

文档评论(0)

Jermain2014 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档