低压深埋水工隧洞衬砌结构分析水利工程专业论文.docxVIP

低压深埋水工隧洞衬砌结构分析水利工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
低压深埋水工隧洞衬砌结构分析水利工程专业论文

AbstrectSTRUCTUR Abstrect STRUCTUR AI.ANALVSIS 0F 1rI心酣EL L玎叮矾G FOR DEEP BURIED LOWoPRESSURE HYDRAULIC Tl价TNELS Subject:water conservancy engineering Adviser:associate professor Miao Long-de k Author:Zhao Jing-Rang :a Adviser:Jiang Suo-Hong ~~~~~{|.驴.咿姆.唧 麓{l{| 蕊“淼 甾‰ Adviser..associate professorYe Lin 屯....沁: a嵋a Abstraet As the increase of the hydroelectric development in our country,the buried depth of hydraulic tunnel is more and more.Although the satisfied result has been acquired in study of structural analysis lining and stress analysis of surrounding rock in deep buried high-pressure hydraulic tunnel by using finite element method,impercipient analysis ofdisadvantageous factor by external water pressure in deep buried low-pressure hydraulic tunnel exist in mini·hydropower station,as the tunnel’s internal water pressure is less,especially when tunnel endure low head. In this paper,the author in accordance with impercipient analysis of disadvantageous factor by external water pressure when carry out Structural Analysis of Tunnel lining for Deep Buried low-pressure hydraulic tunnels in mini-hydropower station,the method of boundfinite element (plane elastoplastic finite element ofnon-linear fmite element method)to be recommend in Specification for design of hydraulic tunnel is used.The study consists of the surrounding rock’s stability and structural analysis of concrete tunnel lining and the engineering measure need to be do to be carried out for horseshoe-shape hydraulic tunnels in Qinggangxia station of Datonghe River in Qinghai province. The study ofdeformation analysis of(non-consolidation grouting comparing to consolidation grouting to finished)in tunnel and in fault plane to been done. In accordance with the analysis ofthe method ofboundfinite element,acquire the result:sInce the deep buried low-pressure hydraulic tunnel is buried very deep,the tunnel endure more external water p

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档