劲性骨架混凝土拱桥施工阶段仿真分析-桥梁与隧道工程专业论文.docxVIP

劲性骨架混凝土拱桥施工阶段仿真分析-桥梁与隧道工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
劲性骨架混凝土拱桥施工阶段仿真分析-桥梁与隧道工程专业论文

武汉理工大学硕十学位论文Abstract 武汉理工大学硕十学位论文 Abstract In recent years,as a new。type bridge,concrete-filled steel tubular(CFST)arch bridge has been deeply developed in our country’S construction,for its own merits and can luckily make agreement with the factual situation of bridge engineering.Rib construction of the CFST arch bridge is a complicated coupe,it need to adopt space simulation analysis in order that final shape of the bridge and state of strength meet the designing requirement,and offer rational scientific dates for construction controlling. In this paper,basted on the sum-up and investigation of simulation calculation of long-span bridge construction in nation and intemational,A three dimensional finite elemem model of Feng Huang CFST bow string arch bridge is built by using the analysis software MIDAS6.1 l,the detailed approach of space simulation analysis of rib in CFST arch bridge is given out,and activation and passivation technology is introduced in the course of modeling for facilitating the stage analysis of construction,some coefficients of stability of different state construction are found. The space simulation analysis result indicates:simulation analysis of construction not only describe the whole construction coulse,response the strength behavior of whole construction course,but also confirm the rational state at stage ofeach construction,offer the middle goal state for constructing and monitoring controlling.Construction simulation analysis has hecome a dominating method ofstatic analyzing modem bridge already.It is useful for the guidance and the reference to the readers who engage in bridge construction. Key words:simulation analysis ofconstruction,CFST arch bridge,Stability activation and passivation,real·time control II 此页若属实,请申请人及导师签名。独创性声明 此页若属实,请申请人及导师签名。 独创性声明 本人声明,所呈交的论文是我个人在导师指导下进行的研究工作及取得的研 究成果。据我所知,除了文中特别加以标注和致谢的地方外,论文中不包含其 他人已经发表或撰写过的研究成果,也不包含为获得武汉理工大学或其它教育 机构的学位或证书而使用过的材料。与我一同工作的同志对本研究所做的任何 贡献均已在论文中作了明确的说明并表示了谢意。 研究生签名:塑啦1 日期21:z:笸:5 关于论

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档