基于合作博弈解的调峰成本补偿分析-电气工程专业论文.docxVIP

基于合作博弈解的调峰成本补偿分析-电气工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基于合作博弈解的调峰成本补偿分析-电气工程专业论文

哈尔滨工业大学工学硕士学位论文 哈尔滨工业大学工学硕士学位论文 PAGE PAGE VI Abstract Electricity in 3 north China power system is mainly fire power generations, which really lack of hydropower. With the increasing of wind power and peak-vale difference, the pressure of peak load regulation is growing. At the same time, Power plants try to transform condensing power plant into thermoelectric unit one after another, because thermoelectric unit has the advantage of high efficiency and low emission. In heating seasons, the ability of peak load regulation of thermoelectric unit is limited because of heat supply, then, condensing units have to serve depth peak load regulation, and wind turbines have to abandon wind. Now research on calculation of ancillary service cost under electricity market is insufficient. So, there comes a serials of pressing problems such as how to figure out the electricity quantity and cost of depth peak load regulation, how to allocate the peaking cost compensation to all cogeneration units. Firstly, this paper introduces the way to transform cogeneration unit and their running characteristic. The operating of thermoelectric unit is seen as parallel operating of condensing unit and back-pressure turbine. Then, find out the relationship of parameters in each part, after that, we can get the relationship of coal consumption, thermal load and generated power. On the basis of which, we built up a new optimal dispatching model based on the unit consumption features, in this model, power load will be balanced by units in whole network, heat load will be balanced on the spot by each thermal power plant, wind power limit for the predictive output. Secondly, according to the fact that 3 north China power system contains a large proportion of thermoelectric units, and the peaking task is mainly assumed by condensing units, a peaking cost calculation method were proposed. In this method, we can get the power outputs of all units in two different modes, and then a deeply peaking cost c

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档