- 4
- 0
- 约8.79万字
- 约 90页
- 2019-03-06 发布于广东
- 举报
ABSTRACT
As andconstruction constructionhasinevitable
the projects,railway
development
be
onthe would
ecologicalenvironment.Simultaneously,therailway subject
impacted
the Canalso causesoil
towind of railway easily
damageduringoperation project,which
further
erosionthe for thesis
alongrailway.AsZhunger-Shuozhourailwayexample,this
studiesthelawsofwinderosion.Conclusionsasfollows:
different ofembankmentcross—section
1.Wind atthe points
speed measuring
variesrelativetothe ofaircurrentdeceleratesclosetothesurfaceon
contr01.The印IeIed
oftheembankmentthewind
thewindwardsidewithinacertain atthetoe
range,and
from
is is20%-30%.Thenit onthe the
minimum,it’Sreducing growsup slope
speed
themaximumonthe decelerates
toe,reaching shoulder.Similarly,windspeed gradually
the
fromtheshoulderto toe.
2.Wind variousatthe of becauseofterrain
speed measuringpointscutting
the thetoeontheleeward
wind deceleratesfromshoulderto side,
change.Thespeed
anditincreases fromtheshouldertothetoeonthewindwards
您可能关注的文档
最近下载
- 关注学生身心健康纳入日常管理.pptx
- 江苏海事职业技术学院单招职测参考试题库(含答案).docx VIP
- 2026年安庆医药高等专科学校单招职业适应性考试必刷测试卷含答案.docx VIP
- 卫生事业管理学课件 第二章 管理理论与管理职能.ppt VIP
- 电信行业业务基础知识.docx VIP
- Discovery软件操作完整版.pptx VIP
- QCR 9161-2023铁路工程建设项目临时用地复垦规范.pdf VIP
- 新目标七年级Unit7Itisraining第六课时.ppt VIP
- 新外研版九年级下册英语 Module 5 Unit 1 教案(教学设计).docx VIP
- 2018年新建南昌经景德镇至黄山铁路水土保持方案报告书.pdf
原创力文档

文档评论(0)