采矿工程毕业设计(论文)-冀中能源葛泉煤矿开采设计.doc

采矿工程毕业设计(论文)-冀中能源葛泉煤矿开采设计.doc

全套图纸加扣?3012250582 PAGE 2 设计题目:冀中能源葛泉煤矿开采设计 专 业:采矿工程 摘 要 本设计为葛泉煤矿0.9Mt/a新井设计。共分7章:1.井田地质概况;2.井田开拓;3.大巷运输及设备;4.采区布置及装备;5.矿井通风与安全;6.矿井提升、运输、排水、压缩空气设备选型;7.环境保护。 葛泉井田位于河北省邢台地区。井田境界位:西北以F5断层为界,西与凤凰山煤矿相邻,南与南屯井田相连,东北及东部分别以2号煤、9号煤煤层尖灭区为界。井田东西走向约3.8km、南北走向约6.6km,面积15.2km2。采区煤层倾角5°~20°。矿井工业储量为6949万t,可采储量5478万t。矿井正常涌水量为150m3/h,最大涌水量为300m3/h。该矿瓦斯绝对涌出量为2.77m 矿井为立井单水平开拓,矿井主井采用箕斗提煤,副井采用罐笼作为辅助提升。矿井前期通风方式为中央并列式通风,后期为分区式通风。矿井主运输为胶带运输,辅运为柴油机卡轨车运输。工作面采用长壁采煤法,面长150m,采煤工艺为综采放顶煤。矿井年工作日为330d,每天净提升时间18h。矿井工作制度采用“四六”制,三班生产、一班准备。 关键词:立井,井田开拓,箕斗,综采放顶煤,中央并列式通风 Subject : Mining Design of Gequan Coal Mine Specialty: Mining Engineering Name: Qi Zite (singnature) Instructor:Cao Jiantao (singnature) Abstract This design is Gequan mine 0.9Mt / a new well design. Is divided into seven chapters: .. 1 Mine geology; 2 Ida explore; 3 roadway transportation and equipment; 4 mining area layout and equipment; 5 mine ventilation and safety; 6 Mine, transportation, drainage, compressed air equipment selection; 7 environmental protection. Ida Gequan Xingtai in Hebei Province. Ida realm spaces: F5 fault-bounded to the northwest, west and adjacent to the Phoenix Mountain Mine, South and Nam Theun Ida connected to the northeast and east, respectively, on the 2nd of coal, coal seam pinch the 9th district is bounded. Ida east-west approximately 3.8km, from north to south about 6.6km, area 15.2km2. Coal mining area inclination 5 ° ~ 20 °. Industrial reserves of 69.49 million mine t, recoverable reserves of 54.78 million t. Mine water inflow is normal 250m3 / h, the maximum water inflow is 500m3 / h. Mine gas emission quantity is absolutely Mine is a single horizontal shaft exploration, mine main shaft using skip mentioning coal, auxiliary shaft using cage as a secondary upgrade. Mine Ventilation early for the central parallel ventilation, ventilation late for the partition. Mine is the main transport tape transport. Face longwall mining metho

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档