哈尔滨超高压局变电站工程质量管理研究工业工程专业论文.docxVIP

哈尔滨超高压局变电站工程质量管理研究工业工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
哈尔滨工业大学工程硕士学位论文 哈尔滨工业大学工程硕士学位论文 - - II - Abstract Power Industry is concerned with not only the people’s living but also the country’s development, which is one of the most important foundational industries and utilities of a country and is the key aspect about energy safety. With the development of the society, the demands for the companies of power transmission of are growing, such as safer power supplies and better services. At present, the construction modification of the power supply and transmission system has been paid great attention from the government. In the “Eleventh Five Year’s Program”, the nation’s main power transmission system and every province’s ones will be improved. The built quality of the substation which is an important part of the system construction will has great effect on the development of main system. So the engineering quality of it should not be ignored. In the present study, according to the substation(500,000V) engineering quality of the Harbin Extra-high-voltage Bureau, three kind of problems during the substation engineering quality management were mainly analyzed. The first kind was from the main body behaviors of the engineering quality management system. The second was concerned with the factors such as the staffs, machines, materials, laws, environment, which were affecting the engineering quality. The third one was existed in the process controlling of the engineering. It was found that for the main body behaviors the problems were that the behaviors of the construction, building and design companies were not normative. For the factors, the problems were that the quality management awareness of the staffs was poor, the quality of the raw materials did not meet with standards, the machines were old and the engineering environment and the management methods were bad. For the process controlling, the problems are that the preparation before building were insufficient, the engineering plan were not well carried out and t

您可能关注的文档

文档评论(0)

1234554321 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档