环锚预应力混凝土衬砌结构锚具槽区域的应力状态分析-建筑材料专业论文.docxVIP

环锚预应力混凝土衬砌结构锚具槽区域的应力状态分析-建筑材料专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACT The pre-stressed tunnel lining with unbounded circular anchored tendons is a new structure applying in hydraulic tunnel. This structure is mainly applied in the hydraulic tunnel which is in the poor geological conditions of surrounding rock, has high water pressure, and leads to the slope instability of the surrounding buildings because of the water infiltrating the rock. The pre-stressed tunnel lining with unbounded circular anchored tendons has its special advantages as a new form of lining structure: The steel strand in the unbounded lining is double circle, which can make the distribution of compressive stress in lining more uniform and can also reduce the loss of the stress along the path. Compared with the bounded lining, it has larger effective press, and it can reduce the thickness of the concrete lining. In this way, it can save more material and reduce the excavated volume. Above all, it can also greatly reduce the difficulty of the construction, the cost of engineering, and effectively speed up the progress of construction. In view of the advantage of unbonded prestressed concrete lining, it can be seen that the structure has a broad application prospect in the hydraulic tunnel in our country. At present, this kind of concrete lining is only applied in Xiaolangdi Project and Dahuofang water tunnel. The structure also exposes some problems at the point of the operation of the two projects, especially the area of boxout. Through the observation of the Xiaolangdi project, the area of boxout has the problem of oil leakage, it is the weakest part of the whole structure. This paper makes the model of NO.2 tunnel of Xiaolangdi project using ANSYS, respectively analyzes the stress state of the area of boxout during construction and operation stage. Through the comparsion with the test data of NO.2 tunnel, it shows that they have good consistency. The results show that the stress state of boxout area is the most complex, both the maximum and minimum stres

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档