卸船机及桥吊制造及安装流程及质量控制计划表.docVIP

  • 3
  • 0
  • 约1.06万字
  • 约 8页
  • 2019-05-03 发布于江西
  • 举报

卸船机及桥吊制造及安装流程及质量控制计划表.doc

通用桥吊(卸船机)制造及安装流程及质量控制计划表 The main process quality control plan for STS Cranes 报 验 项 目 名 称 Item 报 验 计 划 和 内 容 Inspection plan and content HLMP QC 监理,用户代表the third party and user representative 备 注 钢材 material 钢板、型钢 steel plate and shape steel 钢板预取样(试验) steel sampled making(steel material test) P+QC 钢材复验合格、表面质量、材质跟踪、坡口等 Steel material inspection again to up to grade, surface quality, material trace, bevel 钢板预处理steel pretreatment P+QC 数控下料 NC P+QC+R 拼板 tacking plate P+QC+R 结 构 Structure 箱体结构box structure 前、后大梁 Boom and Girder 三面成形装配报验 3-sides of box assembled P+QC 探伤报告、尺寸报告、材质跟踪表 NDT, dimension, material trace 三面成形焊接后报验3-sides of box welded P+QC H 铰点装配报验 fit of hinges boom and bridge girder P+QC 有关箱体封板前报验. Before closing of sealed box . P+QC 梁的拱度、旁弯、平整度 camber, bend, and flatness P+QC 四面成形装配报验 Box structure assembled P+QC 四面成形整体报验 Box structure finished P+QC H 横梁、立柱、联接梁、梯形架箱体。 Portal beam, leg, link beam, and box of pylon 三面/四面成形装配报验,管子封板前报验(梯形架箱体) 3-sides/box structure assembled, before pipe closing (box structure of pylon) P+QC 探伤报告、尺寸报告、材质跟踪表 NDT, dimension, and material trace 四面成形整体报验 Box structure finished P+QC H 立柱内直梯报验 Ladder in the leg P+QC 结 构 框 架 Frame 机房底盘 M.H. base 底架装配报验 Base structure assembled P+QC 探伤报告、尺寸报告、材质跟踪表 NDT, dimension report and material trace 底架整体报验 Base structure welded P+QC H 电缆槽封板报验 Before cable tray plate closed P+QC 小车架 Trolley frame 箱梁三面成形焊后报验 3-sides welded P+QC 封箱焊后,及主结构装配报验 Box closed and welded, Main structure assembled P+QC 整体完工报验 Notification at completely finished P+QC H 围 棚、司机室、 俯仰室、理货室 shadeof M.H.,operator’s cabin, boom operator’s cabin, checker’s room 框架焊后报验 After structure frame have been welded P+QC 探伤报告、尺寸报告、材质跟踪表 NDT, dimension report and material trace 整体完工报验 Notification at completely finished P+QC H 拉杆系统stay bar sys. 工字钢 H steel 焊前装配报验H-beam assembled P+QC 探伤报告、尺寸报告、材质跟踪表 NDT, dimension report and

文档评论(0)

1亿VIP精品文档

相关文档