- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国地震局地震研究所硕士学位论文
中国地震局地震研究所硕士学位论文 摘要
Abstract
The Three Gorges Project is pivotal project which manages and develops the Yangtse River.The project has integrated many functions that includes preventing and controlling flood,generating electricity and shipping.
The permanent Iocks of Three Gorges Dam is of parts of the Project.
and it plays important role shipping.1t js essentiaI to monitor the locks’ safety.Because it is difficult to reach the monitored places for observer,the data is much.the work is dangerous.and the manuaI intensity is very Iarge it ls necessary to suit of safety monitor data collecting system which should be high IeveI automation and quick observation.
The paper jntroduces how to design the software for data collecting
system of permanenl locks in detail.which has been used in south—line frOm
No 2 to No.6.And it jntroduces the hardware.instrument and sampling principle for data collecting system in brief.According to the wateffall model of the traditional lifecycle methodology,from top to bottom step by step.the paper makes the complex problem simple.The software was developed with Visual C++6.0 of Microsoft Corp.
The paper expatiates the main modules in the software。These
moduIes include seriaf communication,data saving.real—time checking,data displaying,command sending,machine starting up and shutting down and on.The serial communication module controls the communication with MSComm contr01.The data saving module operates the EXCEL document with OLE automation.In addition.the paper provides the programming flow chart of the main parts.
The software has already applied to the south.1ine permanent locks frOm
No.2 to No.6.The deformation data of permanent Iocks had been analyzed。 and the result showed that the software is reliable and stable.
Finally,the paper gives farther improving idea-using new kind of field bus in data collecting system.This field
您可能关注的文档
- 三坐标测量机虚拟坐标测量系统研究-精密仪器及机械专业论文.docx
- 三坐标测量机虚拟坐标测量系统分析-机械制造及其自动化专业论文.docx
- 三坐标测量机动态误差补偿的研究-测试计量技术仪器专业论文.docx
- 三子养阴汤治疗单纯收缩期高血压的临床观察-中西医结合临床专业论文.docx
- 三字格熟语的文化研究-语言学及应用语言学专业论文.docx
- 三峡-葛洲坝梯级水电站模型自动测控系统-检测技术与自动化装置专业论文.docx
- 三子养阴汤联合西药治疗老年高血压临床研究-中西医结合临床专业论文.docx
- 三峡二期围堰砼防渗墙安全性分析-岩土工程专业论文.docx
- 三字经小儿推拿法调治小儿脾虚型亚健康状态的临床观察-针灸推拿学专业论文.docx
- 三峡升船机中承船厢的索力调整-流体力学专业论文.docx
- 三峡永久船闸砼衬砌墙结构设计与监测-建筑与土木工程专业论文.docx
- 三峡水电站钢衬钢筋混凝土引水压力管道的裂缝数值模拟分析-水工结构工程专业论文.docx
- 三峡电力营销问题的研究-工业工程专业论文.docx
- 三峡流域中长期径流预报模型精度评定综合分析及优化方法研究-系统分析与集成专业论文.docx
- 三峡直流输电系统谐波对电站电气设备运行状态影响的仿真研究-电气工程专业论文.docx
- 三峡电力营销问题的分析-工业工程专业论文.docx
- 三峡电站过机泥沙含量分布分析-水利工程专业论文.docx
- 三峡永久船闸中隔墩和闸室直立边墙变形机理的数值研究-岩土工程专业论文.docx
- 三峡翻坝公路隧道岩体稳定分析与治理措施研究-结构工程专业论文.docx
- 三峡船闸中隔墩岩体裂缝分析与处理研究-地质工程专业论文.docx
文档评论(0)