网站大量收购独家精品文档,联系QQ:2885784924

梨园面板堆石坝交通仿真分析研究-水利工程专业论文.docxVIP

梨园面板堆石坝交通仿真分析研究-水利工程专业论文.docx

  1. 1、本文档共70页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACT As a kind of competitive dam type, concrete face rock-fill dam finds wide range of applications in southwest China because of its safety, economy and adaptability. Considering its large construction quantity, tight schedule and high construction intensity, the transportation system (the system of earth excavation, the transportation system to the dam, the transportation system of concrete pouring and other transportation systems) undertakes the various transportation tasks of the entire project. Therefore, how to make its arrangements and planning reasonably has an important impact on the construction progress, investment and safe operation of the entire project. Based on the real-time monitoring system and the characteristics of transportation system in concrete face rock-fill dam, the high-precision construction parameters and boundary conditions are obtained in this article. The earthwork allocation process of Liyuan concrete face rock-fill dam is analyzed, and then the transportation simulation during the period of dam filling is calculated. Furthermore, a comparison between the simulation results and the actual situation analysis is made and the corresponding improvements are proposed. The main results are as follows: Considering the characteristics of transportation process of concrete face rock-fill dam, the traffic simulation model of concrete face rock-fill dam was proposed. The entire traffic simulation process was studied by analyzing the influencing factors, process description and parameters assumptions. The research on traffic simulation of concrete faced rock-fill dam was proposed based on the results of earthwork allocation planning and the information of real-time monitoring. By analyzing their influence on traffic simulation parameters and boundary conditions respectively, the related simulation data was processed, moreover, the traffic simulation model of Liyuan concrete face rock-fill dam was developed. The transportation circumstances d

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档