- 11
- 0
- 约5.99万字
- 约 50页
- 2019-06-25 发布于江苏
- 举报
Abstract
Risk a evaluationandits have
Assessment(PRA)is
Probability quantitative advantages
been when wimother assessmentmethods.At method
emergedcompared safety present,this
in alloverthe isnot inthe
’ hasbeen world.However,PRA
significantprojects applied
applied
C chemicalsbecauseofits
fieldofhazardous deficiency.
been
Basedonthe accumulationof have
PRA,some
practices improvementsproposed
which tothe ofPRAiswiderthan
point problemsexisted.Meanwhile,applicationrange
beforetosomeextents.Thishasa effectto assessmentinour
positive developsafety country.
RiskAssessmentCanbeclassifiedinto5 Hazard
Probability parts,including
accident
estimates,the
identification,probability consequence
riskandthefeedbackontheevaluationofthestructure.Inthis discussed
acceptable paper,it
andfocusedon accident feedbackon
estimates,theconsequenceassessment,the
probability
fireworks hazards
theevaluationofthestructure.Anabout warehouseas
您可能关注的文档
最近下载
- 经营分析会,必须要讲清楚的几个指标(25页 PPT).pptx VIP
- 总经理营销总监经营例会运营分析模板PPT.pptx VIP
- 新人教版九年级语文上册期末测试卷及答案【审定版】.doc VIP
- 2025 经营分析核心指标及搭建指南(23页 PPT).pptx VIP
- 风电项目建设标准强制性条文监督检查计划.docx VIP
- 奥的斯 HAA21310BW(ACD5-MRL 40A)电气原理图.pdf VIP
- 洛阳市第五人民医院2026年编外人员公开招聘备考题库及一套答案详解.docx VIP
- 畜禽屠宰加工企业消防安全指南.docx VIP
- DND传奇职业可选专长.docx VIP
- 洛阳市第五人民医院2026年编外人员公开招聘备考题库及完整答案详解一套.docx VIP
原创力文档

文档评论(0)