中国原料药企业的质量审计.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Inspection-Laboratory Inspection-Laboratory Standard reference Temperature well controlled and recorded; Identification clear and in-place; Material is well balanced; Warehouse control-like management Sample retention Temperature well controlled and recorded; Identification clear and in-place; Material is well balanced; Warehouse control-like management Sample keeping at least 1 year after expiration Inspection-Laboratory Inspection-Laboratory common problem Air exhausted from Bio-identification test is not allowed to go cycling; Some rooms are not very well equipped; balance: no anti-shock table; Room condition for balance and precise equipment, not well controlled Put animal test lab into use without local authority’s permit. Quality Assurance inspection Validation Inspection-Validation VMP Validation Master Plan Validation concept; Organization; Responsibility; IQ,OQ,PQ format or content of the protocol; IQ,OQ,PQ format or content of the report; Definition of ok or not; Validation concept Validation Concept User Requirments Specification 用户需求标准 Funcional Specification 功能标准 Technical Specification 技术标准 Realization 实现 PQ: Performance Qualification PQ:性能确认 OQ: Operational Qualification OQ:运行确认 IQ: Installation Qualification IQ:安装确认 DQ: Design Qualification + GMP-RA DQ:设计确认+GMP-RA Validation organization Group Leader Factory And Utility Equip ment Process Cleaning Method Computer 验证对象 验证进度计划 1月 2月 3月 4月 5月 6月 7月 8月 9月 10月 11月 12月 厂房设施及空调净化系统 DQ ▲ IQ ▲ ▲ OQ ▲ PQ ▲ 纯化水系统 DQ ▲ IQ ▲ OQ ▲ PQ ▲ ▲ 清洗验证 ▲ ▲ ▲ ▲ 分析仪器 ▲ 检验方法 ▲ ▲ ▲ 生产工艺 ▲ ▲ ▲ ▲ Inspection-Validation Installation Qualification Make sure the installation was done according to the producer’s installation instruction and design. Operation qualification The equipment/unit could be running at its max capacity Chinese companies are providing fake info because it is old one Inspection-Validation Performance qualification Continuous 3 batches; Production parameter uses top and low limit; Official batc

文档评论(0)

smdh + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档