信号系统工程项目RAMS 轨道交通列车自动控制系统产品RAMS.docVIP

信号系统工程项目RAMS 轨道交通列车自动控制系统产品RAMS.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
NDE system for railway wheel inspection in a standard FPGA?? A special NDE system built into a low-cost FPGA has been developed for detecting railway wheelflats. The system operates with the train moving at low-speed over a measuring rail. Ultrasonic surface wave pulses are sent at regular intervals and echoes are acquired and processed by the system. The variations in the round trip time-of-flight (RTOF) of the ultrasonic pulse allow to detect and quantify the flats size. The logic design optimizes the storage capabilities by keeping only the rail–wheel contact echo and its environment. For this purpose, a wheel tracking algorithm has been implemented. It allows reducing the data volume by controlling the delay time from pulse emission to the acquisition window following the running wheel. Furthermore, since signals are masked by the rail structural noise, they are processed before executing the tracking algorithm. This work presents the architecture and performance of the developed system with experimental data. A systemic analysis of the Edge Hill railway accident? The Edge Hill railway accident occurred on Sunday 9 May 1999 in Liverpool, England. An Engineers’ scrap train struck a plant quality supervisor. This paper presents the results of a systemic analysis of the accident. The methodology has been to compare the features of the Edge Hill accident with the structural organization (i.e. systems 1–5) of a Systemic Safety Management System (SSMS) model, which has been constructed by employing the concepts of systems. A number of systemic failures have come to light. The findings are related to causal factors of failure of Mock-up test on key components of ITER blanket remote handling system The maintenance operation of the ITER in-vessel component, such as a blanket and divertor, must be executed by the remote equipment because of the high gamma-ray environment. During the Engineering Design Activity (EDA), the Japan Atomic Energy Agency (then called as J

文档评论(0)

44422264 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档