品质管理-FMEA liteon seminar(英文).pptVIP

  • 4
  • 0
  • 约4.97千字
  • 约 33页
  • 2020-03-30 发布于广东
  • 举报
FMEA FMEA/CA/PA An FMEA can reduce or eliminate the chance of implementing a preventive/corrective change which would create an even larger concern. FMEA Communication coordination should occur between all type of FMEA ( i. e. DFMEA, PFMEA, MFMEA, … ) FMEA FMEA program is timeliness Is “bebore-the-event” action, not an “after-the -fact” Up front time product/process change can be most easily and inexpensively implemented, with minimized late change crises. When should a FMEA be started All FMEAs (DFMEA, PFMEA,…) might be started at the same time. The earlier, the better. The Process FMEA should be initiated: · before or at the feasibility stage, · prior to tooling for production FMEA process sequence SAE_FMEA_draft_std.PDF p4 When should a FMEA be generated What should be the scope of FMEA There are three basic cases for which FMEA’s are generated, Case 1: New designs, new technology, or new process. The scope of the FMEA is the complete design, technology or process. When should a FMEA be generated What should be the scope of FMEA Case 2: Modifications to existing design or process (assumes there is a FMEA for the existing design or process). The scope of the FMEA should focus on the modification to design or process, possible interactions due to the modification, and field history. When should a FMEA be generated What should be the scope of FMEA Case 3: Use of existing design or process in a new environment, location or application (assumes there is an FMEA for the existing design or process). The scope of the FMEA is the impact of the new environment or location on the existing design or process. The application of FMEA MFMEA System FMEA Containment FMEA Service FMEA …………………………… SYSTEM FMEA p51 DFMEA Failure Mode Design Objectives (a statement of design objectives is often helpful) --FUNCTION 1 ? FAILURE MOD

文档评论(0)

1亿VIP精品文档

相关文档