- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文原文
Overlying Strata Movement Law in Fully Mechanized Coal Mining and Backfilling Longwall Face by Similar Physical Simulation
H. Yanli, Z. Jixiong, A. Baifu, and Z. Qiang School of Mining, China University of Mining Technology, Xuzhou, China
Received August 7, 2011
Abstract— Fully mechanized coal mining and backfilling technology with gangue, fly ash and losses etc. changes the overlying strata movement characteristics and strata behavior law in the fully mechanized coal mining and backfilling longwall face (FMCMBLF). Based on the similar theory, a model of the overlying strata movement in FMCMBLF is established with sponge and plastic foam whose thickness ratio is 1:2 as the similar backfilling body. From the similar physical simulation, the following conclusions have been drawn: (i). The overlying strata movement develops from bottom to top as the mining progresses in the FMCMBLF and consequently, the subsidence curve of the strata assumes symmetrical bowl. (ii) No caving zone but only fissured and bended zones are found in the overlying strata herein. (iii) The subsidence velocity undergoes a changing process of “minimum, successive accretion, reduction, and stabilization,” and the overburden strata movement lasts for a long time. The test results would provide reference for further research of strata control as well as fully mechanized coal mining and solid backfilling technology.
Keywords: overlying strata movement law, similar physical simulation, backfilling body
INTRODUCTION
With rapid development of national economy and increasing demand for coal resources in China, it is of great importance to study how to extract coal under buildings, railroads and water bodies. Fully mechanized coal mining and backfilling technology with gangue, fly ash and loess etc. is an effective method in this regard. It would not only effectively control the overlying strata movement and limit surface subsidence, but make full use of gangue, fly ash and other soli
您可能关注的文档
- 微通道注塑成型模具设计外文文献翻译、中英文翻译.doc
- 微型消声室的设计外文文献翻译、中英文翻译.doc
- 为慈善组织智能高速,高自动化变种硬币分类外文文献翻译、中英文翻译.doc
- 未来的小规模采矿-环境和社会经济的视角外文文献翻译.doc
- 温室窗帘和窗户通风设备的物理模型外文文献翻译、中英文翻译.doc
- 卧室用现代组合家具设计答辩PPT.pptx
- 卧室用现代组合家具设计开题报告及文献综述.doc
- 卧室用现代组合家具设计任务书.doc
- 卧室用现代组合家具设计说明书.docx
- 无钴干燥系统的发展过程外文文献翻译、中英文翻译.doc
- 中国国家标准 GB/T 48000.1-2025标准数字化 第1部分:通用指南.pdf
- GB/T 48000.1-2025标准数字化 第1部分:通用指南.pdf
- GB/T 32452-2025航天术语 空间环境.pdf
- 《GB/T 32452-2025航天术语 空间环境》.pdf
- 中国国家标准 GB/T 32452-2025航天术语 空间环境.pdf
- 中国国家标准 GB/T 17680.6-2025核电厂应急准备与响应准则 第6部分:场内应急组织与职能.pdf
- 《GB/T 17680.6-2025核电厂应急准备与响应准则 第6部分:场内应急组织与职能》.pdf
- GB/T 17680.6-2025核电厂应急准备与响应准则 第6部分:场内应急组织与职能.pdf
- GB/T 17680.8-2025核电厂应急准备与响应准则 第8部分:场内核应急预案与执行程序.pdf
- 《GB/T 17680.8-2025核电厂应急准备与响应准则 第8部分:场内核应急预案与执行程序》.pdf
原创力文档


文档评论(0)