- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文原文
Back?lling technology and strata behaviors in fully mechanized coal mining working face
Zhang Qiang, Zhang Jixiong, Huang Yanli, Ju Feng
A、School of Mines, China University of Mining Technology, Xuzhou 221116, China
B、State Key Laboratory of Coal Resources Mine Safety, Xuzhou 221008, China
Abstract:Based on the principle of fully mechanized back?lling and coal mining technology and combined with theXingtai Coal Mine conditions, we mainly optimized the coal mining equipment and adjusted the coalmining method in the Xingtai Coal Mine 7606 working face for implementation this technology. Firstly,we de?ne the practical back?lling process as the ‘‘(from back?lling scraper conveyor’s) head to tail back-?lling, step by step swinging up of the tamping arm, gradual compacting, moving formed back?lling scra-per conveyor when the second tamping arm cannot pass and connecting the immediate roof by back material push front material movement’’. Meanwhile, the stress changes of back?ll body in coal minedout area was monitored by stress sensors, and the roof caving law was analyzed by monitoring thedynamic subsidence of à210 west roadway of this face. The site tests results show that using this new back?lling and coal mining integrated technology, the production capacity in the 7606 working facecan reach to 283,000 ton a year, and 282,000 ton of solid materials (waste and?y ash) is back?lled, which meets the needs of high production and ef?ciency. The goaf was compactly back?lled with solid material and the strata behavior was quite desirable, with an actual maximum vertical stress of the back?ll body of 5.5 MPa. Back?ll body control the movement of overburden within a certain range, and there is no col- lapses of major areas in the overlying strata upon back?lled gob. The maximum subsidence and speed were 231 mm and 15.75 mm/d respectively, which proved the practical signi?cance of this integrated technology.
Keywords:Fully mechanized back?lling and coal mining technology,
您可能关注的文档
- 液压系统的动力源是泵和蓄能器外文文献翻译、中英文翻译.doc
- 液压站和液压元件的开发毕业课程设计外文文献翻译、中英文翻译.doc
- 液压支架的静力分析和模态分析外文文献翻译.doc
- 一个 10 自由度机器人机械手的设计及运动分析外文文献翻译、中英文翻译.doc
- 一个动态模型和数值研究中使用的液体平衡器自动洗衣机外文文献翻译、中英文翻译.doc
- 一个树状多支结构模型式程序的线性运动——主动喷雾喷洒机的设计外文文献翻译、中英文翻译.doc
- 一个有关移动机器人定位的视觉传感器模型外文文献翻译、中英文翻译.doc
- 一个展示直线振动筛筛板上单质点运动情况的仿真实验外文文献翻译.doc
- 一台带有滑块曲柄和螺杆机构变速机的运动和动态特色设计外文文献翻译、中英文翻译.doc
- 一种多技术同时进行的设计方法的帆船游艇外文文献翻译及中英文翻译.doc
最近下载
- 2025年电子物证初级试卷及答案.doc VIP
- 烟雾病和烟雾综合征诊断与治疗中国专家共识(2024版).pptx VIP
- Q/CR 549.5-2016 铁路工程土工合成材料 第5部分:土工布.PDF VIP
- GB50168-2018 电气装置安装工程 电缆线路施工及验收标准.pdf VIP
- 人行天桥钢箱梁施工方案.doc VIP
- 建筑工程领域AI应用现状与趋势研究报告 -AI in AEC.docx
- 第5講移民实边:明清时期的边疆移民(4课时).ppt VIP
- 新人教版四年级上册道德与法治精编知识点(背诵用).doc
- 冶金企业全要素评估表(人机物环管).docx VIP
- 一种建筑工程管理用安全防护栏.pdf VIP
原创力文档


文档评论(0)