磨机安全操作规程(英文版).docxVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SAFETY OPERATION PROCUDURE OF MILL = 1 \* ROMAN I. The following should be finished before work: Check whether screws of all parts fixed or not, rotation parts blocked/loose or not, especially for big spoon heads, and slurry pumps function properly or not. Check whether back and forth water supply pipelines, cooling water pipelines, feed trough, discharge trough and slurry pipelines flow smoothly or not. Check whether oil volume of any lubrication point of mill and decelerators appropriate or not on each duty and if there are mineral grains or foreign substances existed between small and big gears. Check whether any protection devices in good condition or not, and whether any person or obstacle under or around the mill. Contact the operator of next procedure, send start-up signal and operate in the designated sequence, that is, start the mill, and then slurry pumps, and feed when they reach normal function. = 2 \* ROMAN II. The following should be guaranteed during operation: Never touch, check or clean running components by hand or other tools during mill and slurry in operation; Passing through or working under the running mill or getting into the protective grid are strictly prohibited. Always check whether all operating components closely connected or not, whether liners too loose to leak slurry or not. When it needs stop, the maintenance should be along with reliable safety measures. Always check motors’ operation, and ensure the sound normal, temperature not exceeding 60 degrees Celsius and current maintained at the rated value. Observe whether feeding uniform or not. Idling without feed is strictly prohibited. Operators on each duty should supplement steel balls timely, proportionately and accurately. Observe circulating load and overflow concentration each half to one hour, and adjust them in time when abnormal conditions come into being. Measure overflow concentration and fineness every hour, and adjust the water supply when overflow concentration and f

文档评论(0)

qwd513620855 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档