- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
FMEA Steps 1 Define the scope for the FMEA2 Identify team members, customer, and knowledge experts3 Develop roles and responsibilities for team members4 Study the product / process / service5 Develop rating scales for Severity, Occurrence, and Detection6 Brainstorm failure modes, known and potential7 List the effects, causes, and current controls for each failure mode8 Assign ratings for Severity, Occurrence, and Detection9 Calculate RPN10 Decide on a threshold RPN11 Prioritize based on RPN and severity, or as required by the customer12 Identify corrective actions13 Implement and verify effectiveness of corrective action14 Complete the documentationFMEA; Step by Step1 Define the scope for the FMEA Define the boundaries within which the product, process, or service will be studied, identifying the operating assumptions, current conditions, and constraints if any. Example 1: Conduct a Process FMEA on PCB manufacturing line 1, starting with operation 10 and ending with operation 250. The assumption is that design of parts is correct, and no shortages The line is setup as shown in process flow drawing # 809901 Example 2: Conduct Design FMEA on the pressure relief valve (Part #JJJKKK) for potential failures under extreme operating conditions Assume no preventive maintenance will be conducted once installed Document on the FMEA startup form ComponentSystemProcessSub systemServiceScope of the FMEAPoints to consider:Who are the customers for the FMEA, and what are their requirements / expectationsExample: Conduct (Process) FMEA on the assembly line for Product A, covering operations 110 through 230 When will this FMEA be considered complete under the given conditions (Remember, FMEAs are considered living documents, as such they need to be updated / revised as things change.)Example: FMEA will be considered complete when the team has implemented all corrective actions as agreed upon based on the RPN threshold This will form the basis for deciding the level at whi
您可能关注的文档
最近下载
- 2025年《新地基基础-基桩高应变法检测》考试复习题库(含答案).pdf VIP
- IPC-7530 群焊工艺温度曲线指南(回流焊和波峰焊) 中文版.pdf VIP
- 农村党员设岗定责情况登记表.pdf VIP
- 外研版(2019) 选择性必修第四册 Unit 4 Everyday Economics Using language教案.docx VIP
- 常见的可爱龙猫卡通插画通用PPT模板.ppt VIP
- 07J912-1变配电所图集.pdf VIP
- 机场容量和航班安排.pptx VIP
- 北师大版(2024)三年级数学上册新教材解读课件.pptx VIP
- T_CSCP T_CSCP0005—2023(电力变压器防腐涂层现场检测规范).pdf VIP
- 第一章结构及其设计教案-高中通用技术地质版必修《技术与设计2》.pdf VIP
文档评论(0)