- 7
- 0
- 约1.31千字
- 约 16页
- 2021-10-11 发布于上海
- 举报
海洋英语课件Lesson 3 Jacket Platform; The jacket,or template,structures are still the most common offshore structures used for drilling and production. Some structures contain enlarged legs,which are suitable for self-buoy-ancy during its installation at the site. ;These structures usually have four to eight legs battered to achieve stability against toppling in waves.
Main piles,which are tubular,are usually carried with the jackets and driven through the jacket legs into the seafloor.
The term jacket structure has evolved from the concept of providing an enclosure( jacket)for the well conduc
您可能关注的文档
- 国际森林土壤研讨会课件Zhang Jing-SCBG,CAS.pptx
- 国际私法课件05第9章 涉外债权的法律适用.ppt
- 过程控制工程第三章单回路控制系统.ppt
- 过程控制工程第四章串级控制系统.ppt
- 过程控制工程第一章绪论.ppt
- 哈工大机械原理考研总结课件.ppt
- 海洋石油开采工程(第八章海上油气储存与集输).pptx
- 海洋石油开采工程(第六章注水与增产增注技术(三、四)).pptx
- 海洋石油开采工程(第七章油气水处理).pptx
- 海洋英语课件Lesson 1 Summary.ppt
- 2023版ESC糖尿病合并心血管疾病管理指南解读.pptx
- 2023版ESC心力衰竭诊疗指南核心更新.pptx
- 2023+WHF建议:超声心动图在Chagas病中的应用.pptx
- 2023版ESC心力衰竭指南更新要点解读.pptx
- 2023版ESC糖尿病合并心血管疾病管理指南.pptx
- 2023+多学科共识声明:SARS-CoV-2感染后择期手术时机及风险评估(更新版).pptx
- 2023版NCDC医疗机构传染病防控责任清单.pptx
- 2023版NHC患者安全专项行动方案(2023-2025年).pptx
- 2023+国际专家共识声明:种系SDHD致病突变患者嗜铬细胞瘤和副神经节瘤的管理.pptx
- 2023版NHC健康中国行动—心脑血管疾病防治行动实施方案(2023—2030年).pptx
原创力文档

文档评论(0)