对各施工班组的规章奖罚制度(1).pdfVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
1, coa l mines, mi ne are i n charge of the water control work responsi bility, and (b) specifically re sponsible for t he te chnical ma nagement of water preventi on a nd control w ork. A, Chief E nginee r, mine b, c, geol ogy, geol ogical survey V ice Presi dent d se ction 2, coal mine s, mine shoul d be the prepa ration of the me dium -and long-term planning a nd control water (a) pla ns, a nd t heir impleme ntation. A, year b, quarters c, 3, coal mi nes, mi ne should be (a) for water education and traini ng to e nsure empl oyees have the ne cessary k nowledge of water control, im proving water control w ork ski lls and t he ability to resist water damage. A, b, c, grass-roots lea ders, l eaders of workers d, head of mine main w ell 4, mi ne and industrial site i n the elevation of the buil ding ( d) local t he hig hest flood l evel, constructi on of dams, canal s or other w aterproofing and drai nage measures. A, is e qual to b, no hig her tha n c, higher tha n d, l ess t han 5, mine mai n pumping station shoul d be at least (b) exits, an exit with incli ned roa dway int o the well bore , over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mi ning area water Chamber, the effective capa city shoul d be a ble to hol d (b) normal infl ow in mining area. A , 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintaine d at a total ca pacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, i n the year before the rai ny season, shoul d com plete over haul (a), and all pumps a nd back up pumps w ere 1 joi nt tests an d found the problem and deal with it. A, 1 b, 2 c, 3 d, 4 -9, complex and very compl ex hydroge ologi cal conditions of mine on the ground coul d not be i dentified whe n mine hy droge ological conditi on a nd water filli ng factors should be persisted, (d) the principl e of strengtheni ng the w ork of survey water. A, diggi ng after the first b, c mi ning, after the first ha d the suspect s will find d, excavations w ill be 10, pe netrating

文档评论(0)

tianya189 + 关注
官方认证
文档贡献者

该用户很懒,什么也没介绍

认证主体阳新县融易互联网技术工作室
IP属地上海
统一社会信用代码/组织机构代码
92420222MA4ELHM75D

1亿VIP精品文档

相关文档