网站大量收购独家精品文档,联系QQ:2885784924

某公司品质制造质量管理知识.ppt

  1. 1、本文档共69页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Can you imagine having to constantly check the many different directions of the gages on the top layer? The bottom layer is much improved. Now, all the gages point in one direction. This slide builds in four segments, click the mouse to reveal entire slide. An error proofing device is a simple technique that prevents mistakes by employing fool-proof methods. ASK: Can you think of some examples? Even error proofing devices need to be validated. Examples: 110/220 electrical plugs Light Bulb Sockets Gas tank inlets (regular vs. diesel) Audio/Video Connections Oven door when cleaning There is only one way the belt will fit. Explain the graph, go over each component in detail. This shows how everything fits together as a whole. Motivation for Timely Feedback 及时反馈的动机 Immediate 1 Day 1 Year High Medium Low 1s 100s 1000s Time to Discover Defect 发现缺陷的时间 Ability to Discover Root Cause 发现根源的能力 Number of Defective Vehicles Built 已经生产的缺陷产品 第六十三页,共六十九页。 Example -- Daily Reporting Metrics (Direct Run) 每天汇报制度 Definition Percentage of vehicles that made it through to the End-of-Line inspection processes with no defects. This is a common, global metric that is computed daily by all Assembly Plants. 下线检查合格的车辆百分比,这是全球统一在所有总装厂每天用电脑记录的制度。 Final Inspection (End-of-Line) 下线检测 Dynamic Vehicle Test or equivalent 动态测试 Other 100% Inspections ** 其他10%检测 (i.e.U/B Check) Total Direct Run = ( 92% * 98% * 96% * 99%) = 86% vehicles with no defect Repair CARE Line # of first time vehicles with at least one defect 至少有一个缺陷的第一次认证 80 20 40 10 % First Time Quality 一次质量认证百分比 92% 98% 96% 99% Total first time vehicles through the station on a given day 在特定时间工位的第一次认证 1000 1000 1000 1000 Repair Repair Repair ** 100% Water Test and 100% Squeak and Rattle Test results are not currently (3/2000) included in Direct Run ** 100%的漏雨测试与异响测试并不包含在Direct Run 第六十四页,共六十九页。 Manufacturing Process Validation Quality System Management Qual

文档评论(0)

虾虾教育 + 关注
官方认证
内容提供者

有问题请私信!谢谢啦 资料均为网络收集与整理,收费仅为整理费用,如有侵权,请私信,立马删除

版权声明书
用户编号:8012026075000021
认证主体重庆皮皮猪科技有限公司
IP属地重庆
统一社会信用代码/组织机构代码
91500113MA61PRPQ02

1亿VIP精品文档

相关文档