- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
铁道信号专业英语教材Introduction to Railway Signaling列车运行控制系统Train Operation Control System
Learning Objectives After learning this unit, you’ll be able to understand:1. the terms related to the CTCS2. the functions and classification of the CTCS3. the composition and working principle of the CTCS4. the working modes of the CTCSLearning Objectives
1.Directions In cities, vehicles must keep a certain distance from each other and run within specified speed limits to avoid traffic accidents or rear-end collisions. But when it comes to the hundreds of trains running on the fixed lines everyday, how can they operate safely without interfering with each other?Part One Lead-in
1.Directions:In cities, vehicles must keep a certain distance from each other and run within specified speed limits to avoid traffic accidents or rear-end collisions. But when it comes to the hundreds of trains running on the fixed lines everyday, how can they operate safely without interfering with each other?Part One Lead-inAnswer: Traffic block
Read the following material and share your understanding of the definition of the train block system, its development and classification.Manually controlled block system: The manually controlled block system is a block system with train staffs, signposts or railway tickets serving as operating licenses for a train to enter, occupy or leave a section. At the two stations at the ends of a block section, there are train staffs or signposts block machines in a mechanical-electrical integrated blocking mode. With the authorization from the arrival station, the departure station can take out the train staff or signpost and hand it to the train as the token to run within the section. Meanwhile, the block section is set occupied and blocked. When the train arrives at the destination station, the train driver shall hand over the train staff or signpost. Until then the block section is clear.Part One Lead-in
Three-aspect and four-aspect automatic block: to detect the occ
您可能关注的文档
- 西门子S7-1500 PLC编程及应用 课件 第3章 S7-1500编程基础知识.pptx
- 西门子S7-1500 PLC编程及应用 课件 第1章 S7-1500硬件组成.pptx
- 西门子S7-1500 PLC编程及应用 课件 第5章S7-1500 PLC数据块和程序块.pptx
- 西门子S7-1500 PLC编程及应用 课件 第9章 S7-1500 PLC控制变频器应用实例.pptx
- 西门子S7-1500 PLC编程及应用 课件 第13章 基于博途软件的PLC编程方法的项目实例.pptx
- 西门子S7-1500 PLC编程及应用 课件 第11章 SCL编程语言应用实例.pptx
- 西门子S7-1500 PLC编程及应用 课件 第14章 S7-1500与C#编程语言通信方法应用实例.pptx
- 西门子S7-1500 PLC编程及应用 课件 第12章 高效编程技术的应用实例.pptx
- 新视野读写教程1_课件 Unit 4 I Love This Game !.pptx
- 铁道信号英语 课件 _unit_6_区间.pptx
- 铁道信号英语 课件 _unit_8_分散自律调度集中_CTC_系统.pptx
- 铁道工务英语 课件 Unit_5_Bridge_Superstructure.pptx
- 铁道工务英语 课件 Unit_6_Bridge_Substructures.pptx
- 铁道工务英语 课件 Unit_7_Railway_Tunnel.pptx
- 铁道工务英语 课件 Unit_8_Tunnel_Structure.pptx
- 《应用英语教程 视听说3》 课件 Unit 10 Tourism.pptx
- 《应用英语教程 视听说3》 课件 Unit 11 Career Planning.pptx
- 《应用英语教程 视听说3》 课件 Unit 12 Architecture.pptx
文档评论(0)