RefertoTAKRAFPONo:034
-1xM-SK4-SYS-30-DS-24-1-1xM-SK4-SYS-48-DS-42-1-5xM-SK4-SYS-60-DS-54-1
(1x321/)(1x306/)(1x313/1x316/1x318/1x319/1x317)
1.ScopeofSupply-1xM-RBC-SYS-30-BU-1xM-RBC-SYS-48-BU-5xM-RBC-SYS-60-BU
(1x321/)(1x306/)(1x313/1x316/1x318/1x319/1x317)
-2xM-ASG-VP-36-1-1xM-ASG-VP-54-1-6xM-ASG-VP-72-1
(1x321/1x322)(1x306/)(1x313/1x316/1x318/1x319/1x317/1x304)
ASGCOManufacturingInc.
2.Manufacturer/Inspectionce301GordonStreet
Allentown,PA18102,USA
3.Participantsinbehalfof:
ThomasDallaPalu,Vice,+1(610)8210216,tdallapalu@
ASGCO
(Manufacturer)
OnBehalfofTAKRAFGmbHMrJesseLaser,QualityInspector,jesse.laser@
(Contractor)
4.Tests:
Sr.
Tests/activities/resultsX/O
No
VisualInspection(VT):
-Allscopeofsupply(includingordersforGermany,Italy,and)werevisuallyinspected.Allmaterialwas
painted/coated.Completedweldswerevisuallyacceptabletotheextenttheywereabletobeinspected.Allrub-
1.bermaterialisnewandcorrect.Allmountingandtensioninghardwarewaspresentedcompleteandcorre