- 1、本文档共36页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PAGE
摘要
白沙水库位于淮河流域沙颖河上游,坝址位于河南省禹州市与登封市交界的白沙村以北300m处。,水库控制流域面积为985km2,占颖河流域面积7230km2的13.6%,占颖河山丘区流域面积1900km2的51.8%,是以防洪灌溉为主,兼顾工业供水、水产养殖、旅游等综合利用的大型枢纽工程。白沙水库总库容2.78亿m3,,按国标《防洪标准》规定,白沙水库工程等别应为大(2)型,泄洪闸为2级建筑物. 泄洪闸设计标准为100年一遇,校核标准为2000年一遇。据《溢洪道设计规范》(SL253—2000)闸下防冲设计标准按50年一遇,校核标准100年一遇。
本次设计是白沙水库除险加固工程中的溢洪道设计.其中包括以下几个方面内容:方案的比较和选择以及水力计算,结构稳定性计算(包括边墩,中墩和挡土墙稳定基底应力计算),简单的施工组织设计等几个方面
关键词: 溢洪道 中墩 水库 结构稳定性
颍河白沙水库溢??道泄洪闸设计
PAGE
PAGE 26
abstract
The Baisha reservoir is located upstream of Huaihe River basin Sha Yinghe, the dam site is located the Henan Province Yuzhou and the Dengfeng city border Baisha village by northern 300m place. The reservoir control drainage area is 985km2, occupies Ying river drainage area 7230km2 13.6%, occupies Ying river massif area drainage area 1900km2 51.8%, is by prevents floods and the irrigation primarily, proper attention to both industrial water supply, aquaculture, traveling large and so on comprehensive utilization large -scale key project. Baisha reservoir total storage capacity 278 million m3, Flood prevention Standard stipulated according to GB code, The Baisha reservoir project bank should be is big (2), The floodgate is 2 levels of buildings, the floodgate design standard is 100 years as soon as meets, The examination standard is in 2000 as soon as meets. According to Spillway Design Standard (SL253 -2000) under the floodgate the design standard of Disappearing energy and guarding against flushes meet according to 50 years, The examination standard meet as soon as 100 years.
This design is the Baisha reservoir except dangerous reinforcement project in spillway design, including following several aspects content: Plan comparison and choice as well as water power computation, structural stability computation including side pillar,center pillar and bulkhead stable basis stress computation, simple construction organization plan and so on several aspects
Key word: spillway center pillar reservoir struc
您可能关注的文档
最近下载
- DB3502_T 105-2023 城市轨道交通工程工程量清单计价规则.docx
- 专题02 《醉翁亭记》三年中考真题(解析版)-备战2022年中考语文课内文言文知识点梳理+三年真题训练(部编版).docx
- 向解放军学习完整版.pdf
- 2024年中国行业大模型市场报告.pdf
- 2023年广东外语外贸大学汉语言文学专业《现代汉语》期末试卷A(有答案).docx VIP
- “促进学校内涵发展 提高教育教学质量”经验总结汇报材料5篇.docx VIP
- 人才测评-管理游戏(上篇).pptx VIP
- 河南省 12YN3、12YN4、12YN5 制冷工程、空调工程、通风与防排烟工程 DBJT19-07-2012.docx VIP
- 肢体残疾康复训练档案肢体残疾康复训练档案.doc
- 潍柴动力纳税分析2022-03.pptx
文档评论(0)