Main installation should be started.doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Main installation should be started

Main installation should be started, into the households or branch road point to check before loading in the lumen and clean. Head office with good lead wrapped in silk jute, one at the end of the flat pipe, one tube relatively fixed on the thread on the outlet, slowly turning into the clasp, grabbed a pipe wrench with a former section pipe fittings, turn the tube to a pipe wrench with another moderately elastic, aim at the tag when straightening, request thread exposed 2-3, hemp and clear it first. 4 to make horns bending, heat two Angle of 75 degrees or so, in the joint saw out of the groove, director saw into duck bill, good spelling should immediately after welding, leveling, looking for positive, straight, then welding. Claw the calibre of the elbow joint parts must be equal and head diameter, the bending radius shall be the pipe diameter is about 2.5 times. 5 shunt valve away from the branch points shoulds not be too far. If the branch is the low of the system, must before the shunt valve and drain plug. Set of tanks in and out of the gate, should be open about tank high in lower 1/3. Wire connected to the pipe straightening reinforce after installation. Put duct should be solid, such as instability can carry two clip sets tank in the end of system, should be installed, elevator. 6 adopts welded steel pipe, the pipe first chosen straightening, clean up tube chamber, tube can be shipped to site installation, the installation program from the first day. Find is the tube in place, on the nozzle to obligate mouth direction accurately, after looking for straight with gas welding spot welding spot welding under pipe diameter of 50 mm or less 3 points, 4 diameter 70 mm or more spot welding, and welding, after welding should be to ensure integrity of the pipeline. 7 steam pipe horizontal pipe should have appropriate gradient, when the slope direction and steam flow in the same direction, I 0.003 grade, should be adopted when slope direction and steam f

您可能关注的文档

文档评论(0)

sd44055 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档