- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Main installation should be started
Main installation should be started, into the households or branch road point to check before loading in the lumen and clean. Head office with good lead wrapped in silk jute, one at the end of the flat pipe, one tube relatively fixed on the thread on the outlet, slowly turning into the clasp, grabbed a pipe wrench with a former section pipe fittings, turn the tube to a pipe wrench with another moderately elastic, aim at the tag when straightening, request thread exposed 2-3, hemp and clear it first.
4 to make horns bending, heat two Angle of 75 degrees or so, in the joint saw out of the groove, director saw into duck bill, good spelling should immediately after welding, leveling, looking for positive, straight, then welding. Claw the calibre of the elbow joint parts must be equal and head diameter, the bending radius shall be the pipe diameter is about 2.5 times.
5 shunt valve away from the branch points shoulds not be too far. If the branch is the low of the system, must before the shunt valve and drain plug. Set of tanks in and out of the gate, should be open about tank high in lower 1/3. Wire connected to the pipe straightening reinforce after installation. Put duct should be solid, such as instability can carry two clip sets tank in the end of system, should be installed, elevator.
6 adopts welded steel pipe, the pipe first chosen straightening, clean up tube chamber, tube can be shipped to site installation, the installation program from the first day. Find is the tube in place, on the nozzle to obligate mouth direction accurately, after looking for straight with gas welding spot welding spot welding under pipe diameter of 50 mm or less 3 points, 4 diameter 70 mm or more spot welding, and welding, after welding should be to ensure integrity of the pipeline.
7 steam pipe horizontal pipe should have appropriate gradient, when the slope direction and steam flow in the same direction, I 0.003 grade, should be adopted when slope direction and steam f
您可能关注的文档
- 【创新设计】(山东专用)2014高考英语一轮复习 高频语法训练 附录5 动词时态和语态.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第10篇 第3讲 二项式定理限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第11篇 第1讲 随机抽样限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第12篇 第1讲 离散型随机变量及其分布列限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第13篇 第3讲 直接证明与间接证明限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第14篇 第3讲 不等式和绝对值不等式限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第13篇 第4讲 数学归纳法限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第12篇 第3讲 离散型随机变量的均值与方差限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 易失分点清零9 解析几何限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第11篇 第4讲 古典概型限时训练 理.doc
文档评论(0)