PayattentiontotheengineeringchangePayattentiontotheengineeringchange
Pay attention to the engineering change, pay attention to the inevitable external conditions on the influence of cost control.
(4) pay attention to the engineering change, pay attention to the inevitable external the conditions on the influence of cost control.
3. Complete consign is used, and the warranty phase project cost control key points
3. Complete consign is 2, and the giant phase project cost control key points
(1) the project after the handover, to timely settlement project, cost analysis, sum up experience.
(1) the project after the handover, to timely settlement project, cost analysis, sum up experience.
(2) control warranty of the warranty costs, and will feedback to the relevant responsible of this problem.
(2) control the giant of the giant costs, and will feedback to the relevant responsible of this problem.
(3) for examination and assessment of cost control, to carry out the system of rewards and punishments.
(3) for examination and assessment of cost control, to carry out the system of rewards and punishments.
Third, the content of the project cost control
Third, the content of the project cost control
Including Labour cost, material cost, cost of engineering equipment, construction machinery and other direct cost, indirect cost control.
O Labour cost, material cost, cost of engineering equipment, construction machinery and other direct cost, indirect cost control.
Four, project cost control method
Four, project cost control method
Project cost control methods are mainly to target cost control costs; Use time limit for a project cost of a synchronized method to control costs. In the construction project cost control, according to the construction drawing budget, implement the branch surely with closing, or pay-as-you-go, is one of the most effective way
The Project cost control methods are mainly to target cost control costs; Use the time limit for a project cost of a synchronized method to control costs. In the construction projec
您可能关注的文档
- On strengthening and improving the administration of vocational schools Construction of execution.doc
- On the Chinese Translation of English Proverbs(浅析英语谚语的中文翻译).doc
- on how to optimize the spoken English teaching in primary school.doc
- On the Cultural Phenomenon of Women by Comparing Chinese and American Contemporary First Lady.docx
- On the Development of Jane Eyre’s Character.doc
- On the Flaws of Traditional English Teaching Model and the Countermeasures.doc
- On the Proper Application of Multimedia in Junior High School浅谈多媒体在初中英语教学中有效利用.doc
- On the road and on the Net.doc
- On the translation of English and Chinese Idioms.doc
- On the translation of English Movie titles.docx
文档评论(0)