evaluationofthe environmental impact assessmentforthe(环境影响assessmentforthe评审).docVIP

evaluationofthe environmental impact assessmentforthe(环境影响assessmentforthe评审).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
evaluationofthe environmental impact assessmentforthe(环境影响assessmentforthe评审)

Evaluation of the Comprehensive Environmental Impact Assessment study for the Proposed Athirappilly Hydroelectric Project Prepared by: Mark Chernaik, Ph.D. Staff Scientist Environmental Law Alliance Worldwide April 2005 This document expresses the opinion of its author and not necessarily the opinions of the U.S. office of the Environmental Law Alliance Worldwide or other individuals or oganizations affiliated with the Environmental Law Alliance Worldwide. At the request of P.B. Sahasranaman, I reviewed the comprehensive Environmental Impact Assessment (EIA) for the Athirappilly hydroelectric project proposed by the Kerala State Electricity Board (KSEB). This EIA contains the following flaws. 1. The EIA fails to justify the need for the project Page 1.3 of the EIA states the following: “By the year 2004-2005, the demand for power will be of the order of 3593 MW. Considering 20% outage for maintenance, the above requirements can be met only with an installed capacity of at least 4312 MW. Thus, the state would face a shortfall of at least 36% vis-à-vis power generation capacity by the year 2004-2005.” A shortfall between energy demand and energy generation capacity does not justify another hydroelectric project in the State of Kerala; it only justifies a project that would manage energy demand or augment energy capacity generally. What this EIA lacks is a rationale for public expense on another hydroelectric project instead of investing limited public funds in an alternative project that might eliminate the shortfall between energy demand and energy generation capacity in a more economical and ecological manner. 1.1 The EIA fails to consider whether investments in improving the efficiency of existing energy generation and transmission infrastructure is a more important priority than construction of another hydroelectric dam According to international experts: “[T]he debate over large dams is moving on in the contex

您可能关注的文档

文档评论(0)

guanjie8song + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档