- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2016年职称英语理工类概括大意专项练习.
2016年职称英语理工类概括大意专项练习
Maglev Trains
1 A few countries are using powerful electromagnets to develop high-speed trains, called maglev trains. Maglev is short for magnetic levitation 1 , which means that these trains float over a guide way using the basic principles of magnets to replace the old steel wheel and track trains.
2 If youve ever played with magnets, you know that opposite poles attract and like poles repel each other2. This is the basic principle behind electromagnetic propulsion. Electromagnets are similar to other magnets in that they attract metal objects, but the magnetic pull is temporary. You can easily create a small electromagnet yourself by connecting the ends of a copper wire to the positive and negative ends of an AA-cell battery3. This creates a small magnetic field. If you disconnect either end of the wire from the battery, the magnetic field is taken away.
3 The magnetic field created in this wire-and-battery experiment is the simple idea behind a maglev train rail system. There are three components to this system: A large electrical power source, metal coils lining a guide way or track, and large guidance magnets attached to the underside of the train.
4 The big difference between a maglev train and a conventional train is that maglev trains do not have an engine -- at least not the kind of engine used to pull typical train cars along steel tracks4. The engine for maglev trains is rather innoticeable. Instead of using fossil fuels, the magnetic field created by the electrified coils in the guideway walls and the track combines to propel the trains5.
5 The magnetized coil running along the track, called a guideway, repels the large magnets on the trains undercarriage, allowing the train to levitate between 1 to 10 cm above the guideway. Once the train is levitated, power is supplied to the coils within the guideway walls to create a unique system of magnetic fields that pull and push~ th train along the guideway. The electric curren
您可能关注的文档
- 2016年商业设施展上海商业设施展-2016年商业设施展上海..doc
- 2016年商品归类决定(Ⅱ)..doc
- 安徒恩20人raid新人必看..docx
- 2016年四川省引进海内外高层次人才需求汇总表..doc
- 2016年四川资阳简阳教师公招考试岗位表..doc
- 2016年国家公务员常识古诗与地理..doc
- 2016年天津会计从业资格考试大纲《会计电算化》..docx
- 安徽2015备考生物精品二轮专项训练之生物工程及技术Word版含答案..doc
- 2016年安徽省会计从业资格考试大纲《会计电算化》..docx
- 2016年小户型卫生间装修效果图案例..docx
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
最近下载
- 4-1 中化泉州石化 3 万吨年干气脱硫制二甲基亚砜项目设备设计说明书(含塔设备计算说明、换热器设计结果、设备一览表).pdf
- 工程造价_横湖桥商业楼土建工程量清单报价.docx VIP
- 浙江师范大学行知学院 学生手册.pdf
- 2025年辽宁沈阳市文体旅产业发展集团有限公司招聘笔试参考题库附带答案详解.pdf
- 川崎病患儿的护理课件.pptx VIP
- 2024年东莞市东华高级中学自主招生数学试卷附答案解析 .pdf
- 中医馆客服知识培训课件.pptx
- 辽宁沈阳市文体旅产业发展有限公司招聘笔试题库2025.pdf
- 全国公开课大赛一等奖小学一年级下册数学人教版《七巧板》课件.pptx
- 辽宁沈阳市文体旅产业发展集团有限公司招聘笔试题库2025.pdf
文档评论(0)