ppt课件-case_study_6.ppt-performanceisthebestpolitics.pptVIP

ppt课件-case_study_6.ppt-performanceisthebestpolitics.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ppt课件-case_study_6.ppt-performanceisthebestpolitics

Lean Six Sigma Project Objectives Methodology is Working! Methodology is Working! For an effective purchase/replenishment pull system, 4 variables must be identified: Demand – the average monthly usage amount Lead time – length of time expired between placing order and receiving goods, measured in monthly units Order interval – how often orders are anticipated, in monthly units Safety stock – amount of inventory to be held to compensate for demand variability and/or lead time variability Up to this point, most of my analysis has revolved around determining demand. Prior to this project, procedures were not standardized or documented. As part of the control plan, inventory procedures were spelled out, documented and distributed. The “Street Light Inventory Procedures” manual will facilitate implementation of the control plan, project understanding for all personnel and staff training in inventory control. Inventory control still needs more work. Cycle counting will be examined in detail and order intervals will be further analyzed. Controlling the Process To date, $400,000 of funds released can be redirected towards better use Methodology is Working Inventory Levels, March 2005 Methodology is Working Since project inception, $400,000 of funds have been made available for use elsewhere. Without this project, inventory values would likely be at the level they were in early 2003. ACTUAL VS 3% ANNUAL INCREASE Annual Budget $1,341,000 of Accumulated Savings BID YEAR Street Light Maintenance Contract BID YEAR Means and standard deviations of usage for each item computed on 24 data points only, to capture any changes in demand over time Means and standard deviations of usage for each item computed on 24 data points only, to capture any changes in demand over time Means and standard deviations of usage for each item computed on 24 data points only, to capture any changes in demand over time A year ago, my division manager, Greg Meszaros, asked me to investig

文档评论(0)

bgl001 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档