工程造价管理前沿外文翻译 毕业设计
On the stage of the project cost management
Abstract
Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives.
Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy,
Even under the WTO and Chinas accession to the world community, Chinas construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the super three is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.
As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.
Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget wil
您可能关注的文档
- 儿童颜色填涂卡 毕业论文.doc
- 儿童智能玩具调研报告 毕业设计.doc
- 发动机故障诊断与维修汽车检测与维修 毕业设计.doc
- 发电股份有限公司安全管理制度汇编全套 毕业设计.doc
- 发泡聚苯乙烯缓冲性能分析方法包装工程 毕业设计.doc
- 法兰零件钻孔夹具的设计 毕业设计.doc
- 发动机不能启动的故障维修设计方案 毕业设计.doc
- 发动机可变配气装置设计 毕业论文.doc
- 方案与交底参考模板(长城杯参考) 毕业设计.doc
- 方波逆变电路的计算机仿真 毕业设计.doc
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)