网站大量收购独家精品文档,联系QQ:2885784924

EXPERIENCE FROM TWO SMALL QUANTITY RH-TRU WASTE SITES IN NAVIGATING THROUGH AN EVOLVING REG.pdf

EXPERIENCE FROM TWO SMALL QUANTITY RH-TRU WASTE SITES IN NAVIGATING THROUGH AN EVOLVING REG.pdf

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
EXPERIENCE FROM TWO SMALL QUANTITY RH-TRU WASTE SITES IN NAVIGATING THROUGH AN EVOLVING REG

WM’03 Conference, February 23-27, 2003, Tucson, AZ 1 EXPERIENCE FROM TWO SMALL QUANTITY RH-TRU WASTE SITES IN NAVIGATING THROUGH AN EVOLVING REGULATORY LANDSCAPE Jennifer Biedscheid and Murthy Devarakonda Washington TRU Solutions, LLC 6100 Seagull Lane, Suite 202, Albuquerque, NM 87109 Jim Eide Battelle Columbus Laboratories 505 King Avenue, Columbus, OH 43201 Dennis Kneff Energy Technology Engineering Center P.O. Box 7922, Canoga Park, CA 91309-7922 ABSTRACT Two small quantity transuranic (TRU) waste generator sites have gained considerable experience in navigating through a changing regulatory landscape in their efforts to remove the TRU waste from their sites and proceed with site remediation. The Battelle Columbus Laboratories Decommissioning Project (BCLDP) has the objectives of decontaminating nuclear research buildings and associated grounds and remediating to a level of residual contamination allowing future use without radiological restrictions. As directed by Congress, BCLDP must complete decontamination and decommissioning activities by the end of Fiscal Year (FY) 2006. This schedule requires the containerization of all TRU waste in 2002. BCLDP will generate a total of approximately 27 cubic meters (m3) of remote-handled (RH) TRU waste. Similarly, the Energy Technology Engineering Center (ETEC) is scheduled to close in 2006 pursuant to an agreement between the U.S. Department of Energy (DOE) and Boeing Canoga Park, the management and operating contractor for ETEC. ETEC had 11.0 m3 of RH-TRU and contact-handled (CH) TRU waste in storage, with the requirement to remove this waste in 2002 in order to meet their site closure schedule. The individual milestones for BCLDP and ETEC necessitated the establishment of site-specific programs to direct packaging and characterization of RH-TRU waste before the regulatory framework for the WIPP disposal of RH-TRU waste is finalized. The lack of large infrastructure

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档