网站大量收购独家精品文档,联系QQ:2885784924

设备验收流程和设备检验规格书.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
设备验收流程和设备检验规格书

 HYPERLINK /a/ruanjian_jiaoxue/2009/1227/112.html 设备验收流程及设备检验规格书 以下为设备验收流程,仅供参考: 1.0 Machine qualification activities description 设备验收执行过程描述 After receiving machines, it will spend 1week to verify machine function and reliability before send it to user. Below describes in details how to verify machine step by step until machine delivery to site according to the flowchart. ? 收到设备后,需要1周时间验证设备的功能和可靠性。以下定义设备检验步骤。 Qualification Flowchart? 检查验收流程图: ?? ?????????????????????????????????????????? 1.1 Verification Preparation??? 检验准备 It is required to prepare the following items before starting verifying machine: 检验前需准备以下事项 1)?Machine 设备 2)?Machine drawings设备图纸 3)?Machine verification specification checklist设备检查规格和清单 4)?Machine labeling and machine control number设备标识及客户资产编号 5)?DUT样品 6)?Test Station if required 测试站 7)?Measurement if required检查工具或设备 1.2?General Information Completed设备信息的填写 At this beginning, Pls. fill in the general information of machine, such as machine number, description, revision, control number, serial number,? equipment ID number, verified by, verify date and so on. Below is for referenced: 开始请填写设备信息如编号,描述,版本等等,以下可供参考 ???????????????????????????? 1.2?Documents Verifying? 文件检查 This section is to check if the machine will be verified by using correct relative documents, software, test station, DUT etc; So it need to complete the following items, see below for reference: 这里主要检查和确认是否用最新且正确的图纸,规格,软件,测试位,样品等来检验设备, 请参考如下: 1.2?Mechanical/Pneumatic Verifying? 机械和气动部分的检查 This section is mainly to verify mechanical and/or pneumatic portion of machines. If result for each item is accepted, concession or rejected, Pls. complete the comment/result column with “OK”, “UAI” or “NG” and signed the name in checked by column.? If it is UAI or NG, it is better to add some comments on the column and also annotate the comment on machine labeling for tracking. If it is good, just complete with “OK” and no need to annotate on machine labeling. Below items are step by ste

文档评论(0)

ktj823 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档