设备验收流程和设备检验规格书
HYPERLINK /a/ruanjian_jiaoxue/2009/1227/112.html 设备验收流程及设备检验规格书
以下为设备验收流程,仅供参考:
1.0 Machine qualification activities description 设备验收执行过程描述
After receiving machines, it will spend 1week to verify machine function and reliability before send it to user. Below describes in details how to verify machine step by step until machine delivery to site according to the flowchart.
?
收到设备后,需要1周时间验证设备的功能和可靠性。以下定义设备检验步骤。
Qualification Flowchart? 检查验收流程图:??
??????????????????????????????????????????1.1 Verification Preparation??? 检验准备It is required to prepare the following items before starting verifying machine: 检验前需准备以下事项1)?Machine 设备2)?Machine drawings设备图纸3)?Machine verification specification checklist设备检查规格和清单4)?Machine labeling and machine control number设备标识及客户资产编号5)?DUT样品
6)?Test Station if required 测试站7)?Measurement if required检查工具或设备
1.2?General Information Completed设备信息的填写At this beginning, Pls. fill in the general information of machine, such as machine number, description, revision, control number, serial number,? equipment ID number, verified by, verify date and so on. Below is for referenced: 开始请填写设备信息如编号,描述,版本等等,以下可供参考
???????????????????????????? 1.2?Documents Verifying? 文件检查
This section is to check if the machine will be verified by using correct relative documents, software, test station, DUT etc; So it need to complete the following items, see below for reference: 这里主要检查和确认是否用最新且正确的图纸,规格,软件,测试位,样品等来检验设备, 请参考如下:
1.2?Mechanical/Pneumatic Verifying? 机械和气动部分的检查This section is mainly to verify mechanical and/or pneumatic portion of machines. If result for each itemis accepted, concession or rejected, Pls. complete the comment/result column with “OK”, “UAI” or “NG” and signed the name in checked by column.? If it is UAI or NG, it is better to add some comments on the column and also annotate the comment on machine labeling for tracking. If it is good, just complete with “OK” and no need to annotate on machine labeling. Below items are step by ste
您可能关注的文档
- 让学生乐于数学课堂教学探究.doc
- 让好习惯伴随儿童健康成长小学生行为规范养成教育小结.doc
- 让学生乐学做课堂上主人.doc
- 让学生在体验中学习有价值数学.doc
- 让学生主动走近数学本质小学教学设计第10期].doc
- 让对话生成课堂教学精彩.doc
- 让孩子爱上数学扑克游戏.docx
- 让小学生在英语课上动起来.doc
- 让我们和孩子一起走进新课程.doc
- 让我们课堂更有效.doc
- 2-红河州建筑施工安全生产标准化工地复核评分表(2022年修改版).docx
- 6.锡通项目2018年下半年工作会汇报材料(2018.7.9).docx
- 2018道路工程知识点汇总(新版).docx
- 附件3:月度生产例会安全汇报资料-站台门项目部.docx
- 附件2:广东建工集团2018年度科技成果汇总表.DOC
- 马武停车区、三汇停车区停车位管理系统,0#台账缺量.doc
- 攀成钢委办发〔2015〕19号(党风廉政建设责任考核与追究办法).doc
- 1-红河州建筑工程质量管理标准化复核评分表(2022年修改版).docx
- 中交第三公路工程局第四工程分公司项目经济合同结算管理办法(修订).doc
- 厂站安全操作规程汇编.doc
文档评论(0)