- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
输煤栈桥吊装方案(国外英文资料)
输煤栈桥吊装方案(国外英文资料)
Steel wire rope
32 mm
40 m
?
3
prise
six
?
4
AC350/6 mobile crane
350 tons of
1
?
5
RT1650 mobile crane
170 tons of
1
6
50 tons of mobile crane
50 tons
Two (2)
?
7
Snap ring
8 tons
six
7
gourd
6 tons
four
8
BX1-400 type welder
Two (2)
?
9
Gas cutting machine
2 the
?
10
Activity (club) wrench
10 the
?
11
hammer
18 p
2 the
The hoisting officer shall be the master and deputy commander of the command.
A list of the top crew members
Order no.
name
Working duty
Professional status
one
Well feifei
To be in charge of the general command and to be responsible for the overall work
Related certificates
2
YuJi
The deputy commander in charge of the installation shall be responsible for the specific work
Related certificates
Hoisting labor requirements (see table below)
Labor demand list
The serial number
Install the group name
The number (group)
(people)
one
Components hoisting of
one
8
2
Subunit installation group
one
4
3
welder
one
4
(5) other preparations:
High signal transmission: there must be a person in charge of the unified command, the command signal is unified in advance, the signal should be bright and accurate.
Warning signs are set up: there should be an obvious warning sign on the loading site, the method of setting up the safety fence and warning signs.
Security alert: after the lifting of the lifting, the special person will be on the security of the hoisting, wearing yellow sleeves, holding the yellow flag and security guard.
The sequence of hoisting
1 # walkbridge - 2 #, 2a # walkbridge - 6 # walkbridge - 7 # walkbridge - 8 # walkbridge - 9 # pier bridge
-3 # walkbridge - # 4 piers - 5 # piers
Transport of coal trestles and steel columns
According to the pier and the length of the steel column (35 m, 25 m 1 #, 2 #, 3 # 18 m 18 m, 12 m in 4 #, 5 #, 6 # 18 m, 7 # 16.5 m, 8 #, 9 # 12 25.5 m, 10 # 25.5 m) according to the actual situation to do the following:
The loading should be balanced and avoid partial load.
Before transportation, the total we