输煤栈桥吊装方案最终(国外英文资料).docVIP

输煤栈桥吊装方案最终(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
输煤栈桥吊装方案最终(国外英文资料)

输煤栈桥吊装方案最终(国外英文资料) Construction plan for the construction of coal trestle bridge The basis of preparation: The blueprint provided by China tianchen engineering co., LTD. Oil and chemical equipment working manual. 3, the automobile crane ac35/6, RT1650 standard mode heavy lifting performance watch 4, the construction of the construction of the chemical industry shall be the standard HG20201. Construction technology standard qb-cncecj21604-2006 Construction manual (4th edition) Practical hardware manual (7th edition) Second, the general situation of the project Inner Mongolia east China energy of 1.2 million tons/year methanol project raw coal storage and transportation project coal trestle crane. 1 #, 2 # transfer station for the 1 # pier, warehouse after coal corridor between floor between the screening for 2 #, 2 # pier, a screening floor corridor is to transfer station for 3 # 3 #, 4 #, 5 # pier, 3 # transfer station to boiler room for 6 # pier, 3 # coal transfer station to slurry preparation area for 7 #, 8 # pier, coal slurry preparation area to two area for 9 # pier. In order to ensure the engineering quality pass rate reached 100%, creating excellent project, make the product quality and meet the design requirements? Quality inspection and acceptance of steel construction projects? (GB50205-2001),? Specifications of the welding technology of construction steel structure? (jgj81-2002) standard, special order for the project. Third, engineering characteristics: 1, this project is a special structural engineering, for maximum lifting height of 40 meters, lifting radius is 21 meters, the heaviest pier is 55 tons, through measuring 350 t car crane and lifting rack, steel column and artifacts. 2, all piers will need two 50T cars to be hoisted to the loading dock. According to the scene, the 350-ton car crane and the 170T crane are hoisted on the side of the pier, 10 meters from the pier, and the two cranes are hoisted simultaneously. 4, because of the site limits, a

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档