- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
FIDIC施工合同条件中承包商向业主索赔的条款(国外英文资料)
FIDIC施工合同条件中承包商向业主索赔的条款(国外英文资料)
The terms of the contractors claim to the owner for the contract of the FIDIC construction contract
The FIDIC redbook in table 99 covers the terms of the contractors claim to the owner
The serial number
The terms of
reason
Time (T)
cost
(C)
profits
(P)
(express/implied)
one
1.3 the communication
The owner or engineer may not be able to impound or delay a particular item of approval, certificate, uniform and determination of a particular item, resulting in the delay of the contractor and the loss of expenses
Square root
Square root
Square root
The implied
2
The custody and delivery of 1.8 documents
The owner or engineer found the technical error or defect in the construction document, and the failure of the notice caused the contractor to delay and the cost of the loss
Square root
Square root
Square root
The implied
3
Drawings or instructions for being late
The engineer fails to release the drawings and instructions within a reasonable time, causing the contractor to delay and lose the cost
Square root
Square root
Square root
express
4
The owner USES the contractors documents
Without the consent of the contractor, the owner to the contractor by the design of the documents for the contract to a third party outside the copying, use or transfer, this may cause the loss of the contractor
Square root
Square root
The implied
5
1.13 comply with the law
The owner shall be responsible for the loss of the expenses incurred by the contractor in order to obtain the relevant license mentioned in this paragraph
Square root
Square root
Square root
The implied
6
The right to enter the scene
The owner fails to give the contractor the right to enter or occupy the site, causing the contractor to delay and lose the cost
Square root
Square root
Square root
express
7
The personnel of the owner
If the owners personnel do not provide the cooperation or do not take corresponding measures to cause the delay and incur the contractors expense loss
Square root