- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GLOBAL QUALITY
MANUFACTURING POLICIES
全球质量制造政策TITLE
SUPPLIER CERTIFICATION PROCESS
供应商 NUMBER 编号
0006-2115 REVISION 版次
G DATE 日期
06/01/09 AUTHOR 作者
R. Reyes REVISED BY修改
R. Reyes APPROVED BY 批准人
Peter Lee
1 SCOPE 范围
1.1 Products and Components Covered涵盖产品和组件Suppliers that are required to be certified as determined by Product Integrity.
要求供应商必须产品。1.2 Exemptions 豁免
Suppliers of paint, ink, powder coating, lacquer (varnish) and dyes for VUM must be certified per
the following: 油漆,油墨,粉末涂料,漆供应商(漆)和染料发誓要以下内容:. GQMP 0006-2109, Certification Process: Category 1 Surface Coating Supplier
GQMP,认证过程0006-2109:第1类表面涂层供应商. GQMP 0006-2110, Certification Process: Category 2 Surface Coating Supplier
GQMP,认证过程0006-2110:第2类表面涂层供应商. GQMP 0006-2111, Certification Process: Category 3 Surface Coating Supplier
GQMP,认证过程0006-2111:第3类表面涂层供应商1.3 Definitions (Words that are defined are italicized and bolded once per section)
1.3定义(词的定义是斜体和粗体一次,每次一节)Batch: A quantity of homogeneous material that has been produced in a single continuous operation under a defined set of conditions.
批次:一均质材料一个连续操作条件下已批量生产设置定义。Certified Supplier: A supplier who has been certified by Mattel per this document.
合格供应商:。Provisional Certification: Status granted to a new supplier that allows them to sell materials or components to Mattel while qualifying as a Certified Supplier.临时认证:状态给予了新的供应商,允许他们出售的材料或以美泰组件,同时为供应商资格认证 Subcontractor: A third party that is paid by a supplier to add a process step(s) to raw materials or semi-finished goods in the manufacture of components for Mattel. Examples of subcontracting activities include but are not limited to the following:
分包商:一种是由第三方供应商支付给添加一个处理步骤(县)原料或半制成品在为美泰部件制造。例子分包活动,包括但不限于以下内容:a) A manufacturer used primarily to perform a specific process (i.e., injection molding, blow
molding, rotocasting and extrusion) because the subcontractor has the expertise and
equipment to provide the service or support production during peak season.
1)制造商主要用于执行特定程序(即,注塑成型,吹塑成型,和
您可能关注的文档
- 应急预案案例分析国内案例摘要.pdf
- 第六章 三相异步电动机Y-△降压启动控制线路.pptx
- 用户手册(融易付客户端) 二期资料.pdf
- 随着互联网技术的出现与广泛应用.doc
- 怎样利用空闲时间来建立经济学模型-瓦里安详解.doc
- 第十一章 采用非递归深度优先遍历算法.doc
- 企业质量、环境、职业健康安全方针及目标.doc
- 参考文献的查找、引用与格式.doc
- 第八章 公文排版字体要求以及印制要求.doc
- 6S和精益化管理.ppt
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)