材料单选题(国外英文资料)
材料单选题
Construction materials
1, the strength of ordinary concrete grade is guaranteed by 95% (B) days of standard size cube compressive strength
Degrees are represented by values.
A, 7, B, 28, C, 3, 7, 28, D, (A+B)
2. The penetration test of asphalt can be used to determine the penetration of (D) needle.
A, viscous bitumen, B, liquid petroleum asphalt, C, emulsified asphalt, evaporation residue D, A+C
3, when mixing concrete, it is found that the water holding property of the mixture is poor, and measures should be adopted (A) to improve it.
A, increase sand rate B, reduce sand rate C, increase cement D, reduce water cement ratio
4, the biggest influence factor to the concrete mixing logistics dynamic is (D).
A, sand rate B, cement variety C, aggregate gradation, D and water consumption
5, a certain batch of Portland cement has been tested and its volume stability is not good, then the cement (A).
A, shall not use B, can be used in secondary engineering, C, and can reduce the intensity of use
D can be used in engineering, but must be improved
6. When determining the setting time of cement, when the test needle sinks to the bottom plate (A), that is, the cement reaches the initial setting.
A, 4mm, + 1mm, B, 2mm ~ 3mm, C, 1mm ~ 2mm
7, with the increase of asphalt content, the porosity of asphalt mixture (A).
A, decrease B, increase C, decrease first, then increase D, increase first and then decrease
8. The concrete mixture is stratified and separated, indicating that (B).
A, poor mobility, B, poor cohesiveness, C, poor water retention, D, A+B+C
9, cement mortar strength test three, test body 28 days flexural strength is 7.0MPa, 9.0MPa, 7.0MPa, flexural strength test result is (A).
A, 7.0MPa, B, 7.7MPa, C, 9.0MPa, D, 8.0MPa
10, cement initial setting time does not conform to the regulation is (B), the final setting time does not conform to the regulation is (A).
A, nonconforming product, B, reject
11, under the condition of penetration and elongation unchanged, the sof
您可能关注的文档
- 叉车12(国外英文资料).doc
- 反激变压器设计原理(国外英文资料).doc
- 发电厂电气部分复习资料(国外英文资料).doc
- 发电厂电气部分--第14讲(国外英文资料).doc
- 发电车百题文库(国外英文资料).doc
- 发电机无功功率(国外英文资料).doc
- 发育相关(国外英文资料).doc
- 变压器巡视(国外英文资料).doc
- 变电运行 技师 题库(国外英文资料).doc
- 变电运行资料 文本文档(国外英文资料).doc
- 2025年新能源汽车铝合金型材表面处理报告.docx
- 2025_2026学年新教材高中历史第四单元资本主义制度的确立9资产阶级革命与资本主义制度的确立课时作业含解析新人教版必修中外历史纲要下.doc
- 2026版高考历史一轮训练课后限时集训10近代西方民主政治的确立与发展含解析人民版.doc
- 2025年光伏支架轻量化研发趋势与材料创新报告.docx
- 2025_2026学年新教材高中英语UNIT3SPORTSANDFITNESS预习新知早知道学案含解析新人教版必修第一册.doc
- 初中道德与法治八年级上册《爱我中华》单元教学设计(1).docx
- Unit9IlikemusicthatIcandancetoSectionA(3a3c)(教学课件)人教版(0)九年级英语全册().pptx
- 四年级下册《我的“自画像”》习作指导课教学设计——基于例文支架的精准表达训练.docx
- 星火燎原:新中国“两弹一星”伟业的奠基与精神传承.docx
- 中考英语一轮复习:解锁单项选择的逻辑与策略(第一讲).docx
最近下载
- 医学课件-生物活性材料诱导牙本质再矿化和仿生矿化的研究进展.pptx
- Anhao安翰磁控胶囊胃镜系统NU-I用户手册.pdf
- QC成果提高环氧地坪一次验收合格率.pdf VIP
- 物性数据表_瑞士EMS PA610 Grilamid XE 3959 nat.pdf VIP
- SY_T 5225-2019 石油天然气钻井、开发、储运防火防爆安全生产技术规程.docx VIP
- 长安深蓝S7使用说明书(增程版).pdf VIP
- SL∕T 618-2021 水利水电工程可行性研究报告编制规程.pdf
- 2024年考研203日语真题.doc VIP
- 建筑施工 - 07J306集水坑施工图集.pdf VIP
- 抗震支架安装施工方案及技术措施.docx VIP
原创力文档

文档评论(0)