- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑专业英语_04 Foundation
The Materials of Foundations * * Unit 4 Foundation foundation 基础 文本 文本 文本 Objectives Dialogue Passage A Exercises Interactive Work Teaching Steps 进入 进入 进入 进入 进入 3. Design a subscription form. Objectives 1. Tell your partner how to drive the precast piles. 2. Explain the independent foundation and continuous foundation. 主菜单 DIALOGUE A: It is very clear that the quality of underground works is critical for the whole works. We cannot expect a stable superstructure without a solid foundation. B: That’s true. It is our duty to comply with the specification. A: Did you train the workers according to the procedures? B: Yes, we did. Before starting the woks we had a trial operation in an empty area. After making sure that each group of workers were able to do the job smoothly, we started the work. You will be satisfied if you see the result of the soil consolidation. 主菜单 A: Well, The soil consolidation is a very successful operation. Now I would like to see the operation of driving precast concrete piles. What preparations did you make before driving the precast piles? DIALOGUE B: First, the site should be even and solid enough to move piling machines. The second thing is that the axial lines and the piles position should be rechecked. The third is that the barriers such as stones or old concrete blocks should be removed before driving piles. A: How many piling tests have you made? B: Eight piling tests have been made. DIALOGUE A: What is the vertical tolerance for the piling? B: According to the specification, the vertical error cannot be above 0.5% of the pile length after the driving operation. A: What test will you make after the piles have been driven to the positions? B: We will carry out the strength variation test to make sure that the piles are driven properly. DIALOGUE trial operation 试验施工 make sure 确保 carry out 推行,贯彻 comply with 服从、遵守 the vertical tolerance 垂直偏差 driving precast concret
您可能关注的文档
最近下载
- 1.1_犬的起源、进化与特征.ppt VIP
- 2024高考语文考前精刷卷专题十四文学类文本阅读散文.docx VIP
- 大学语文之诗经电子教案.doc VIP
- 高校生活超市和24小时便利店租赁经营投标常用方案(最全).doc VIP
- 15J001 围墙大门图集标准.docx VIP
- 双向搅拌桩加固高速公路软土地基现场对比试验研究.pdf VIP
- 铁道概论:铁路信号和通信PPT教学课件.pptx VIP
- 《医学微生物学》课件——细菌的形态与结构.ppt VIP
- 贵州丹寨金汞矿日处理500吨(一期250吨)金汞原矿浮选生产线技改项目环境影响报告书.pdf VIP
- 大一新生班干部竞选演讲稿PPT.pptx VIP
文档评论(0)