- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理 继续教育20130527(The supervisor continued education 20130527)
监理 继续教The supervisor continued education
Problem 1 (2)
GB 50369-50369 long oil and gas pipeline engineering construction and acceptance standard regulation, with cable trench buried pipelines installation, the minimum clearance (refers to two section of vertical projection interval) should not be less than (B).
A. 0, 2m
B. 0, 3m
C. 0, 4m
D. Zero, 5m
Problem 2 (2)
GB 50369-50369 long oil and gas pipeline engineering construction and acceptance standard regulation, the end of the pipeline pressure testing, pigging with hygroscopic agent, dry mixture of pipe ends after discharge, methanol, glycol content of hygroscopic agent quality percentage is greater than (C) for qualified.
A. 60%
B. 70%
80% C.
D. 90%
Topic 3 (2)
GB 50235-50235 industrial metal pipeline engineering construction and acceptance standard regulation, the tube cutting, the pipe surface should be smooth, no cracks, double skin, burrs, protruding sunken, shrinkage, slag, oxide, iron filings, etc. The oblique deviation of the end face of the incision should not be greater than the diameter of the tube (B) and must not exceed 3mm.
A. 0.5%
B. 1%
1.5% C.
D. 2%
Problem 4 (2)
GB 50369-2006 the test of gas pipeline construction and acceptance specification, all welded joints shall be 100% girth (D).
A. liquid penetration detection
B. Tensile strength test
C. Full test
D. nondestructive testing
Topic 5 (2)
SH/T 3532-3532 code for construction and acceptance of the petroleum and chemical heat exchange equipment, pressure test should be done when the heat exchange equipment, must be approved by the (B) the safety technical measures, and safety supervision in the process of pressure testing.
A. technical director of construction unit
B. general manager of construction unit technology
C. Responsible person of the supervising unit
D. construction unit project manager
Problem 6 (2)
GB 50169-2006 the grounding of the electrical installation engineering grounding device construction and acceptance spe
您可能关注的文档
- 折手拼版的原理(The principle of folded hands).doc
- 折点加氯去除氨氮(Let's add chlorine to remove ammonia nitrogen).doc
- 拍摄技巧与常识(Shooting techniques and common sense).doc
- 招聘行政主管的笔试题(Recruitment of administrative supervisor's pen test).doc
- 招牌材料参考指南(Reference guide for signature materials).doc
- 招生计划说明.doc
- 拥有领先技术支撑体系 云烟是这样炼出来的(This is how the leading technology support system works).doc
- 拳皇97电脑键盘操作技巧(Kwon 97 computer keyboard manipulation skills).doc
- 指挥权战场争夺的新焦点(Command the new focus of battle contention).doc
- 指标字典(Index dictionary).doc
- 监控中同轴电缆的传输距离(The transmission distance of coaxial cable in monitoring).doc
- 留学携带清单(Study abroad carrying list).doc
- 监理细则01(Supervision rule 01).doc
- 盘算机专业英语教授教养办法切磋(To calculate the professional English teaching method to learn).doc
- 盲文的起源与发展(The origin and development of braille).doc
- 直线平行的特征(The characteristic of a straight line).doc
- 直线的倾斜角和斜率教学设计(The teaching design of straight line inclination and slope).doc
- 直线运动练习题1(So I'm going to do a straight line exercise).doc
- 相似三角形的性质(徐炜蓉)doc(Properties of similar triangles (xu weirong) doc).doc
- 直缝埋弧焊钢管的选用(The selection of straight seam submerged arc welding pipe).doc
最近下载
- 高一数学(必修二)立体几何初步单元测试卷及答案.docx VIP
- “二次元经济”崛起背后的商业逻辑.docx VIP
- 【阶段测试】人教版数学六年级上册第一单元《分数乘法》单元测试卷27.doc VIP
- 中国谷子经济分析:从哪吒旋风看二次元IP衍生品市场崛起.pdf VIP
- 2025年全国高考山东省物理真题试卷(含答案).pdf
- 2025年人教版数学六年级上册单元测试卷-第一单元 分数乘法(含答案).pdf VIP
- 《不负'食'光拒绝浪费》班会课件.pptx VIP
- 部编本《一块奶酪》优质课公开课教案课堂教学实录.docx VIP
- DB13T 5448.3-2021 工业取水定额 第3部分:医药行业.docx VIP
- 山东省安装工程消耗量定额(2016).pdf
文档评论(0)