建筑施工手册系列之建筑地面工程18-8 室外附属工程(Construction Manual series of building ground engineering, 18-8 outdoor ancillary works).doc

建筑施工手册系列之建筑地面工程18-8 室外附属工程(Construction Manual series of building ground engineering, 18-8 outdoor ancillary works).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑施工手册系列之建筑地面工程18-8 室外附属工程(Construction Manual series of building ground engineering, 18-8 outdoor ancillary works)

建筑施工手册系列之建筑地面工程18-8 室外附属工程(Construction Manual series of building ground engineering, 18-8 outdoor ancillary works) Construction Manual series of building floor works, 18-8 outdoor ancillary works,.Txt heart is a two bedroom house, one living in pain, one living happily. People cant laugh too loudly, or they will wake up the pain next door. This paper by Xian 2006 contribution DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. 18-8 Outdoor ancillary works 18-8-1 apron The apron has a brick, concrete, concrete and other materials paved. Its structure is shown in figure 18-93 and figure 18-94 and figure 18-95 (a), (b). Figure 18-93 apron brick structure map Figure 18-94 concrete apron structure map Figure 18-95 concrete apron apron structure transverse slope is 5%. water before the construction, should draw on the outer surface of the upper edge of the standard high water, according to the width of transverse slope and apron, outward formwork, formwork should be top apron edge elevation (apron is brick digging groove), the top surface of the template should be higher than the outdoor terrace 50mm. brick apron, should first pull in a trench for brick, brick top high outdoor floor 50mm. Water soil dug into 5% slope, compacted three times (such as poor soil, should be dug to the depth of 10cm, three times 3:7 lime soil compacted backfill), soil surface with sand, flat brick, sand and concrete pouring construction. Concrete apron with the ground surface layer. The corresponding corner of concrete apron and every 12m long to indwelling seam deformation. The corner cracks at an angle of 45 degrees with the outside wall angle, and other parts of exterior wall is vertical. The position of the deformation joints should be avoided in the water nozzle. Joints with asphalt mortar. 18-8-2 ditch The ditches were brick and rubble, concrete and other materials paved. Its structure see

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档