论中国建筑业的价值管理.pdfVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
苏州科技学院学报(工程技术版) 第2l卷 第 2期 J.of University of Science and Technology of Suzhou V01.2l No.2 20o8年6月 (Engineering and Technol Jun.2008 C omments on Value Management i。n the Construction Industry of China ZHANG Jing-yan , WilliamRussell (1.School of Architecture and Urban Planning,USTS,Suzhou 21501 1,China;2School of Technology,University of Glamorgan, Cardiff DF37 11T,UK1 Abstract:The value management is increasingly being adopted by all sections of the construction industry in China.The solution to the problem is actually an innovation different from other management methods.The process seeks improved value—for—monev outeoines that maximize the standards of quality or performance within the resource limits available.At present,the value management is just on its way to the development,thus needs further improvement in China. key words:value management M);China Construction Industry(CCI);value engineering(VE) Chinese Library Classification:TU-021 Literature Label Code:A Paper Numher:1672-0679(2008)02—0055一O4 1 Introduction Norton and McElligott(1995)stated that:“The term Value Management defines a broader management ap— proach to value rather that term Value Engineering,which is a narrow approach and focuses on the technical performance’’【l】.“Value Management is an approach which aims to establish.at the start of the project.the strate— gic plan by which it should develop.at the start of the pmject,the strategic plan by which it should develop.This is partly achieved through the use of a series of workshops at key stages of the project;and is complemented by Value Engineering techniques.These also make use

文档评论(0)

yingzhiguo + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5243141323000000

1亿VIP精品文档

相关文档