市政管网工程量计算规则(Calculation rules of municipal pipe network volume).docVIP

  • 16
  • 0
  • 约6千字
  • 约 6页
  • 2017-08-03 发布于河南
  • 举报

市政管网工程量计算规则(Calculation rules of municipal pipe network volume).doc

市政管网工程量计算规则(Calculation rules of municipal pipe network volume) Calculation rules of municipal pipe network volume 2011-09-02 13:06 Engineering quantity calculation rule 1 、 pipe laying according to the design drawings, the length of the pipe centerline is calculated by m, and the length of various fittings, valves and flanges is not deducted. 2. Masonry channels and concrete channels shall be calculated at m according to the design drawing dimensions. 3. Pipe laying in the casing. According to the design drawing, the length of the pipe centerline is calculated by M. 4 、 pipeline overhead crossing, pipe immersed pipe crossing, according to the design drawings, the length of the pipe centerline is calculated by m, excluding the length of pipe fittings, valves and flanges. 5, prestressed concrete pipe conversion parts, cast iron pipe fittings, steel pipe fittings, flange steel pipe parts, plastic pipe fittings, plastic steel conversion parts, directly buried prefabricated heat preservation pipes, pipe fittings installed according to the number of design drawings, in order to calculate. 6, the flange between the steel pipe connection, the old and new pipe connection (meet), according to the design drawing quantity to be calculated. 7, water separation, blind (blocking) plate, decontamination device, compensator installation, waterproof sleeve production, installation, according to the number of design drawings in order to calculate. 8, steel bracket production and installation according to the design drawings, size multiplied by unit theory, quality to t calculation. 9, masonry replacement according to design drawings, the length of the pipe centerline to m calculation. 10, valves, water meters, fire hydrants installed according to the number of design drawings in order to calculate. 11, inspection wells, rainwater inlet, other masonry wells, concrete work wells, according to the design figures, the number of seats. 12, equipment foundation, support (block) pier accord

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档