- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土冬季混凝土施工措施(Construction measures of concrete winter concrete)
Construction measures of concrete winter concrete
There is no new technology, the overall construction technology is not much difference with 30 years ago, the biggest difference is that more mechanization, less clay brick, reinforced with a bit more, less on-site mixing of concrete, cracks more, less construction period.
Winter construction has its specific meaning, and its not going to stop in the winter. In terms of quality, when the temperature is too low, it can cause concrete or mortar to freeze before it is fully solidified, thus unable to achieve the design strength. In turn, if there is a measure to make concrete or mortar solidify before it freezes, the temperature change will not adversely affect its strength.
Usually adopted measures, mainly through the cover of the methods for thermal insulation, then add antifreeze reduce the freezing point flow pattern of the concrete or mortar, the third in before noon to stop construction, concrete can fully solidified before cold at night.
Therefore, in the winter construction of the house, the building quality will not necessarily have problems. The key is to take appropriate measures.
In order to ensure that the rules and regulations of concrete into the mold temperature is not less than 5 ℃, first of all, according to the thickness of aggregate, such as temperature and heat capacity, calculation of water heating temperature, according to the calculation of the temperature to heat water, to guarantee the discharge temperature of concrete, and the discharge temperature of concrete for inspection at any time, adjust the water temperature. If the temperature is low, even if the water reaches the boiling point and cant reach the calculated temperature, it should be re-calculated to heat the coarse aggregate to ensure the material temperature. Mixing in the process of feeding order must be adjusted, first add the thickness of aggregate, water blender mixi
您可能关注的文档
- 马哲练习答案第五章(Mahe practices the answer chapter 5).doc
- 马克思主义意识论(Marxist theory of consciousness).doc
- 美的mc-ef197电磁炉故障检修实例(An example of fault maintenance of Mc-ef197 electromagnetic furnace).doc
- 美的空调室内外机控制电路与功能讲解(The control circuit and function of indoor and outdoor machine of beauty air conditioning).doc
- 美国对日本的封锁作战(The United States fought a blockade of Japan).doc
- 美国航天中心(The American space center).doc
- 美国惊呼中国高铁计划世界第一(The U.S. calls China's high-speed rail program the world's largest).doc
- 美国气体催化剂大全(American gas catalysts).doc
- 美国现代设计的发展(The development of modern American design).doc
- 美国邮编(The zip code).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)